Laserfiche WebLink
AIL <br /> . IFIED PROGRAM CONSOLIDATED <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page I of 2) ENVIRONMENT HEALTH <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 17� I II <br /> BUSINESS NAME(Same as Facility Name or DBA) FLYING J TRAVEL PLAZA 3. <br /> BUSINESS SITE ADDRESS 15237 THORNTON ROAD 103 CITY LODI 104 <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> b the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed b ualified personnel.[23 CCR.§2632,2634,2638,2641.] <br /> ...................................................... ......__..........................Y...9........................... ................................................... <br /> Y...............e9......I�........._..._..__............................................................................_..............................................Y.................._..................................................... ............................... <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> IIIc ,MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S);, ;ai <br /> k <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: VEEDER-ROOT/OMNTEC 490-7 MODEL#: TLS-350/800011 490-1. <br /> LEAK SENSOR MANUFACTURER: VEEDER-ROOT 490-9. MODEL#(s): 303 490-10. <br /> -............................._... ........_._._..._._......_ .._............---................ <br /> _..__.._. .............................. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL 7f §i.[23 CCR§2643] 490-11. <br /> PANEL MANUFACTURER: 490.12" MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490`14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify). ago-]s. <br /> ......................................................................._..............................._.....................................__.._.._�_..._................._g g.p.h. ......._a9o-t9. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] 490-20. <br /> .... . ............................................................................................................................._............................................................._......_................................................................................. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[z3 CCR§z6as1 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21. <br /> 490-22. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): ago 24. <br /> Q ( P fi') a..... <br /> ® <br /> 99.OTHER(specify): VISUAL DONE DAILY 490-26. <br /> 490.27. <br /> V. PIPE MO O GIS fERFO D USING FOI:I O G'METHOD(S) (Qaeckgtl, <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-21• <br /> [23 CCR <br /> SECONDARY CONTAINMENT IS: ® a.DRY [3b.LIQUID FILLED El c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> §2636PANEL MANUFACTURER:VEEDER-ROOT/OMNTEC 490-30. MODEL#: TLS-350/800011 490-31. <br /> LEAK SENSOR MANUFACTURER: VEEDER-ROOT 490-32. MODEL#(S): 322 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> -------......._..................................................................-............................................................................._......._.._._..................................._. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S):FE PETRO 490-37. MODEL#(S): MLD 490-38. <br /> ........................................................................................----.................................._...._. ...._._........................................._................._........._ ...................... <br /> ( <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD) <br /> THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> ..............................................................................................................................................................................................................................................................._........ <br /> ® 4.PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ® c.OTHER(Specify) N/A D/T OS.Shutdow11 490-47. <br /> ..................................................-...............................................................................................__....._._._.._...................__.._....._._...................................................................................................................................................................................................................... <br /> ..............490.48..... <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> ._......_..... <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)] 490-50. <br /> ......................_......_...._............_................................................................................................................................................................................................................................................................._...._.._..........._......_............................................................................................................................................................................................................._.._.__....._ <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ❑ <br /> .................................................................................................._..........................._..............................................................--.........................................................................................................................................................._..............................._.._................................................................................................................................................................4 . . <br /> .._............_99.OTHER(Specify) 90-52. <br /> 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />