Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae I of 2 <br /> TYPE OF ACTION ❑1.NEW PLAN ® 2.CHANGE OF INFORMATION ' <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 2 <br /> 490-z <br /> (Check one item only) ❑ 2,THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTCM( `• <br /> L FACILITYINFORMATION some FFA a I lab <br /> FACILITY ID#(Agency Use Only) - Nv Ne FE r <br /> _ <br /> ............ ____ _...__ _............:.........._..... <br /> BUSINESS NAME(Same as FACILITY NAME) Flying J Travel Plaza #617 <br /> -...._....... ...._................. i _ <br /> BUSINESS SITE ADDRESS 15237 N.Thornton Rd 107' crrY Lodi 104" <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> -resting,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performcd at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632.26342638 2641 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY C199,OTHER(Specify): 490-3b <br /> ICI MONITORING LOCATIONS - <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490=4 <br /> _ IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM °90-6 <br /> __......_..__ .. ___.__ ._.._.._-___ _ �. ---------- <br /> PANEL MANUFACTURER: Veeder Root 490 7, MODEL#: TLS 350 40 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 9` MODEL#(S); 794380-302 490-ro <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR MINGLE WALL ANK($).(23 CCR§2643) <br /> PANEL MANUFACTURER: 4912` MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14- MODEL#(S). H Oso is' <br /> LEAKIEST FREQUENCY: El a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 4916 <br /> ❑ d.MONTHLY ❑ e,OTHER(Specify) 490-17 <br /> ». 490.18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ e.OTHER(Specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490. 22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 4923 <br /> 4900-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 49°-26 <br /> ❑99.OTHER (Specify);VISUAL DONE DAILY 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METROU(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE.AND <br /> 490.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490 29 <br /> -_-._...-_-._.--._._ __ u._..._ _H._._. _ _ _v _ � � � �_ __..__ ._------ ---- <br /> PANEL MANUFACTURER: Veeder Root 490-30 MODEL#: TLS-350 490-31 <br /> -_-__-._,.__-..__.................. ._._._._.� __ _._.�_......w� ___ _._.....-._-. .. __.._._ ._. ._...--_.._ w.__._.............__. __._..._.._..._.... <br /> 490.32 MODEL#(S): T1-#794380-322 490-33 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 'I'2 T3 T4,T5-#794380-352 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a,YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 Cgg 2636_- r _. - v_ _. _. _.._.._.._.. 490-36 <br /> MLLD MANUFACTUPXR(S): FE PETRO,VAPORLESS 490-37 MODEL#(S); STD-MLD/LD3000 490-3 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) _ _ 490-39 <br /> - .ELLD MANUFACTURER(S) # <br /> � - »�490-4o_ MODEL#(S} �TM« -�49041 <br /> DDEL _.._ <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49°42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 440-4s <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ e.OTHER(Specify) N/A D/Tpos.shutdoWn <br /> 49046 49047 <br /> 5,VISUAL PIPE MONrrORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c,MIN.MONTHLY&EACH TIME SYSTEM OPERATED° 49049 <br /> •Allowed for monitorinA ofunburied emer enc nerator fuel&ina only ger HSC 125281,5(b)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)). 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 49°•51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490.53 <br /> UPCF UST-D(12/2007) <br />