Laserfiche WebLink
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br /> UST Monitoring Site Plan <br /> Site Address: Pilot Flying J--15100 Thorton Rd, Lodi CA <br /> 1E ENO <br /> O.ora'amar - <br /> P=Monitoring Cannot Panel <br /> S.Sensor <br /> STP-Tumino Sump <br /> F=Fill BucKat <br /> V=Mar 8 <br /> A=Annual Sonar <br /> M.Aulomagc Tank Gage <br /> TS=Transition Sump <br /> L=Line Look Detector <br /> Product <br /> Linos= <br /> Vent Un— """"" <br /> Vepar <br /> CAS=Clean Air Soporalor <br /> y� Vent Una <br /> Emergency Shut Off SyAch <br /> � e Overiik Alarm <br /> Exempt STP/S&-TurWnW Sensor/Una <br /> ' Leak Delctor <br /> 40 <br /> gA 1 <br /> 1 <br /> Ls <br /> AA <br /> CT (4 V d <br /> @¢ ,T <br /> k4•. � <br /> i <br /> a r { , <br /> LTG,,® <br /> we <br /> � i 3 i 4f7 <br /> i l £ <br /> � .. �.f AUd <br /> Lei •••f .112. <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it, rather than this page,with your <br /> Monitoring System Certification. On your site plan,show the general layout of tanks and piping.Clearly identify locations <br /> of the following equipment, if installed: monitoring system control panels;sensors monitoring tank annular spaces, <br /> sumps, dispenser pans, spill containers, or other secondary containment areas;mechanical or electronic line leak <br /> detectors;and intank liquid level probes(if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. <br /> Page 5 of_ <br />