Laserfiche WebLink
L` <br />Fiberglass-Contposite Pipe Division <br />Ameron International Fiberglass -Composite Pipe Division <br />hereby certifies that <br />Nahum Valdez <br />Fillner Construction <br />has completed training on the proper installation procedures for <br />the Dualoy 3000 UL Listed fiberglass piping systems <br />indicated below as manufactured by the <br />Fiberglass -Composite Pipe Division of <br />Ameron International Corporation. <br />DUA.LOY 3 000 <br />/L 11 /LCX <br />California <br />Location <br />Location of Training) <br />October 24, _2008 <br />- -- Date of Training - - <br />Issued By <br />Certificate valid for three years from date of issue <br />9720 Cypresswood Drive, Houston, TX 77070 <br />Fass9e <br />