My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Wiring the Conduit Box <br />X1051-301-2.eps rG) <br />0 -ring <br />c� Ground wire screw <br />1 <br />I Ground wire <br />Cup washer terminal <br />External toothed washer <br />Power and thermal overload <br />leads to pump <br />NOTE: for European installations, the --- <br />End User must use an ATEX EEX d 116 <br />certified cable gland or stopping box. <br />(V Conduit) <br />Conduit from control box <br />Figure 2. Conduit Box - Yoke Assembly <br />WARNING! Disconnect, lock out, and tag power at the panel before starting to service the pump. <br />When servicing equipment, use non -sparking tools and use caution when removing or installing <br />equipment to avoid generating a spark. <br />1. Connect the electrical conduit through the approved fittings to the conduit box. <br />2. Remove the conduit box cover. <br />3. Connect the wires from the power supply to the wires in the conduit box. <br />4. Install the gound wire from the power panel. <br />5. Sparingly lubricate the o -ring before screwing the cover into the manifold, Use light grease, oil, or petroleum <br />jelly. Replace the conduit box coven Do not use pipe sealant On the conduit box cover's threads. Tqrque to 35 <br />ft -Ib (50 N -m). <br />0 <br />7 <br />0 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.