Laserfiche WebLink
Installation Wiring the Conduit Box <br />3-PHASE POWER SUPPLY <br />L1 L2 L3 iro5� soy s.eps <br />(2 -Wire shown) <br />0 On -Off <br />i oUi Y switch <br />a cv u <br />i i i a <br />m <br />m Black Blue <br />3 <br />T'lT2 T3 <br />RedSeal <br />Oran a Local seals <br />Black where required <br />by code. <br />•p <br />:. � r �.• : rp• r q' ep. a' :a '.: n e.e. .D '. .D. o. .p '. <br />. ♦ d . ,•� • ,OM1 , J . 1 •.. .. O D •' • .. B • _.� 1.'C.� .. .. � 4 � ... .. .. 0� <br />NOTE: if 115V is not available from power supply, pilot <br />lights may be operated from any 115V lighting circuit by The control box must be grounded for personal safety. <br />controlling with a 4 -pole starter. Otherwise, Refer to the National Electrical Codes and applicable <br />230V pilot lights must be used. local codes for proper grounding procedures. <br />Figure 6. Representative Wiring Diagram, Three -Phase, Two -Wire Control <br />4 <br />13 <br />