My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:44 AM
Creation date
6/23/2020 6:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
when the liquid level reaches a preset ng level (90 - 95% full). 01 <br />The Morrison 9095A Series is now approved with the City of New York Fire Department <br />(Approval #5028). <br />Download Specification Sheet pdf <br />V�&Jllffo= 14111 <br />The new test mechanism option for the 9095A allows a technician to verify that the valve is <br />functioning properly without having to climb on the tank or uninstall the valve. As a part of an <br />ongoing tank maintenance program, one can verify the valve is working properly by pulling on <br />the test line at any time during the filling process to actuate the float and stop the fill. <br />This added capability will increase safety by eliminating the risk of climbing on the tank to test the <br />valve. It is also a quick and simple way to ensure that the Morrison Overfill Prevention Valve is <br />working correctly. <br />The mechanism can be used for both direct and remote fill applications. <br />The test mechanism is sold separately as an option and is available for both the 2" and 3° valves. <br />It will retrofit to existing valves. <br />The Fig. 9095SS Morrison Overfill Prevention Valve is designed for use on top loading storage <br />tanks that require an overfill prevention device. The valve terminates the fill when the product <br />reaches the preset level. The valve can be retrofitted on existing tanks and fits into a 2" opening. <br />• The 9095SS has proven compatibility, durability and reliability through cycle testing in actual <br />DEF transfer systems. <br />• The valve has completed cycle testing and compatibility testing. <br />• The valve materials meet the required specifications of ISO 22241-3 for handling DEF. <br />• The wetted materials are Stainless Steel Alloys 304 and 316, Teflon and Polypropylene. <br />• The valve design allows for a full flow fill until it closes. The dashpot design ensures <br />a reduction of line shock at shutoff. <br />• The valve flow rate is 150GPM at 50PSI. <br />• 5 PSI & 5 GPM is the minimum flow requirement for valve operation. The valve is compatible <br />with fluids that have a density greater than 0.717 grams per MU6.00 lbs per gallon and a <br />maximum viscosity of 150 centistokes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.