Laserfiche WebLink
Aft <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax:(209)468-3433 Web:www.sjgov.orq/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> FLYING J TRAVEL PLAZA A617 1 15237 N THORNTON RD LODI May 13 2015 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS 11,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 308 CCR 2636(f) Failed to maintain a continuous monitoring system that activates an audible and visual alarm. <br /> The T-4 87 fill sump sensor failed to activate an audible and visual alarm when tested to ensure continuous monitoring <br /> of the tank system. All monitoring equipment shall be maintained to activate an audible and visual alarm or stop the <br /> flow of product at the dispenser when it detects a leak. The sensor was replaced and retested during the inspection. <br /> A"UST Retrofit Verification with Inspector Already Onsite" form has been completed and provided to the operator and <br /> contractor. This was corrected on site. <br /> This is a minor violation. <br /> Overall Inspection Comments: <br /> On site to conduct the routine inspection and witness the annual monitoring system certification testing. Complete <br /> and submit a copy of the Return to Compliance Certification form to the EHD with a statement documenting the <br /> corrective actions that have been or will be taken for each violation, and any supporting paperwork, by 6-13-15. <br /> Please be aware that as of January 1, 2014, facility operators are required to upload the following UST program <br /> documents into the California Environmental Reporting System (CERS): UST Monitoring Site Plan, UST <br /> Certification of Financial Responsibility, UST Response Plan, UST Letter from Chief Financial Officer (if <br /> applicable), and the Owner Statement of Designated Operator Compliance. The UST Owner/Operator: Written <br /> Agreement, if applicable, can be stored at the facility or uploaded into CERS. <br /> Note: <br /> Leak detector testing was last performed on 5-15-14 and is due before June 2015. Leak detector testing has not <br /> been completed during the 5-13-15 annual monitoring system certification testing and will be considered late if this <br /> testing is not witnessed by the EHD. These tests are required once every 12 months. Immediately schedule these <br /> tests and provide 48 hours notification to the EHD. Please be aware that a follow up inspection will be charged at <br /> our current hourly rate. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS F CILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received By _ Received By(printed name and title): Dat <br /> (signature): a Jose Jimenez, General Manager <br /> Inspector Inspector(printed name and title): Inspector Phone: <br /> (signature): ARIS VELOSO, Senior REHS (209)468-3453 <br /> Page 4 of 4 <br />