Laserfiche WebLink
WINTER WARNING <br /> FOR COLD WEATHER AT 50°F DEGREES OR LESS: <br /> OBSERVE AND FOLLOW THE WARNINGS BELOW <br /> BRAVO SYSTEMS FF-SERIES FLANGE FITTINGS AND F-SERIES <br /> FITTINGS ARE THICKER THAN THE TYPICAL FIBERGLASS CLAMSHELLS <br /> COMMONLY INSTALLED IN FIBERGLASS PIPING APPLICATIONS. <br /> YOU MUST APPLY ADEQUATE HEAT TO THE PARTS AND BONDING <br /> ADHESIVES TO ALLOW A FULL CURE TIME DURING EXTREME COLD <br /> TEMPERATURES. FAILING TO ALLOW THE INSTALLATION TO FULLY <br /> CURE MAY CAUSE THE ADHESIVE BOND TO THE FITTING TO FAIL. <br /> JUST BEFORE EACH ADHESIVE APPLICATION <br /> DRY FIT YOUR COMPONENTS ONE LA <br /> r_.._ rjE .L <br /> 1) PRE-HEAT THE SUMP TO NO MORE THAN 150°F TO ELIMINATE MOISTURE. K, <br /> 2017 <br /> �(� <br /> 2 0 1 l <br /> Z) PRE-HEATING COMPONENTS IN EXTREME COLD WEATHER IS CRIT IIC� <br /> L�1��ONMEIVTAL I-IEALT <br /> > PRE-HEAT THE FIBERGLASS FITTING THOROUGHLY TO -100°F DERARTMENT <br /> > PRE-HEAT THE ADHESIVE TO -80°F. DO NOT HEAT CATALYST!! <br /> 3) DO NOT ASSUME THE ADHESIVE IS CURED BECAUSE IT HAS HARDENED ON THE <br /> EXTERIOR. IT MAY ONLY BE A CURED "CRUST" IN THIS TEMPERATURE AND ANY <br /> MOVEMENT OR WATER TESTING MAY CAUSE DELAMINATION AND TOTAL FAILURE <br /> OF THE BOND. <br /> 4) DO NOT ADJUST, MOVE, SHIFT OR OTHERWISE DISTURB THE <br /> SUMP, FITTINGS OR PIPING DURING THE CURING PROCESS. <br /> 5) ! YOU MUST ENSURE A FULL CURE BEFORE WATER TESTING. FOLLOW <br /> YOUR ADHESIVE INSTRUCTIONS FOR TEMPERATURE GUIDELINES. <br />