Laserfiche WebLink
STEP 8 (COMPLETE ET) <br /> RECEIVEI <br /> BEAD ADHESIVE <br /> HEAVILY ON ALL SEAMS JAN 12 2011 <br /> C (� Q 3600 DEGREES AROUND <br /> P aFITTING BEFORE� CLEANUP ENVIRONMENTAL HEALI <br /> DEPARTMENT <br /> R E 0 ' 11 <br /> 1 E <br /> X,-„ .' <br /> 2 2071 <br /> .. o PIPE CLAMP ENVIRONMENTAL HEM <br /> SEAL YOUR FITTING DEPARTMENT <br /> BODY TOGETHER. <br /> Stick this assembly to the wall and apply a strong pressure to push the halves <br /> together and against the wall, aligning the marked stripe. When joined, rotating <br /> the fitting back and forth helps. <br /> Adhesive should ooze from every seam and joint while pushing the fitting halves <br /> together against the pipe and wall. Clean the face of the fitting with acetone or <br /> equivalent and remove excess adhesive. You want the fitting clean enough to <br /> remove the pipe clamp after the fitting cures. <br /> Use provided pipe clamp to secure the fitting halves to each other. More adhesive <br /> may ooze from the split seams as you tighten, re-clean as necessary. <br /> LET THE FITTING(s) CURE DO NOT CAUSE PIPE <br /> OR CONDUITS TO MOVE OR TWIST DURING CURE <br /> After a full cure, remove the pipe clamp holding the two fitting halves together. If it is <br /> too difficult to remove and appears to be bonded in place, do not force it off. <br /> STEP 9LAKE TESTINGest Water Testing): <br /> ( ng). <br /> After the F-Series Retrofit-S Fittings are installed and have fully cured, water level test to a <br /> maximum of 2" above the highest penetration fitting on the sump. Follow local regulations. <br /> 13 ii-F-Series-Retrofit-S-13B <br />