Laserfiche WebLink
RECEIVED <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (-Oubmit-minimum-of-S-sets-of-pla"ns-&-applications-as-originals-will-be-retalned-by-EHD)—DEC 0 7 2016 <br /> 1. Site map enclosed? YES[)I NO[] ENVIRONMENTA,L HEALTH <br /> 2. Submit copies of ICC Service Technician and/or Installers certificate and all manufacturer training ceiiil._k W14614r <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attacha diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (if <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> -Replace one (1) non-fiberglass 1"conduit penetration with Bravo SWAT repair penetration At TI-STP sump <br /> Replace one (1) non-fiberglass 2"siphon penetration with Bravo SWAT repair penetration at T3 STP sump <br /> Replace one (1) non-fiberglass 2"siphon penetration with Bravo SWAT repair penetration at T3 STP sump <br /> Replace one (1) non-fiberglass 314"conduit penetration with Bravo SWAT repair penetration at T4 STP sump <br /> Replace one(1)non-fiberglass 2"product penetration with Bravo SWAT repair penetration at TS Fill sump <br /> Replace one(1)non-fiberglass 2"product penetration with Bravo SWAT repair penetration at UDC 7/8 <br /> Perform agency required testing of newly installed repair components <br /> -4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> (3) 2"Bravo SWAT(F-20-RETROFIT-S-LCX) <br /> (2) 3/4"Bravo SWAT(F-07-RETROFIT-S) <br /> (1) 1"Bravo SWAT(F-1 0-RETROFIT-S) <br /> EH230038(revised 7-26-2016) 3 <br />