Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer X Industry Standard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used:Incon TS-STS Equipment Resolution: <br /> Spill Box#T-5 Fill Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: 11" <br /> Bucket Depth: 11" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes <br /> starting test: <br /> Test Start Time: 10:26 am—10:41 am <br /> Initial Reading(Rj): 4.5460 4.5457 <br /> Test End Time: 10:41 am—10:56 am <br /> Final Reading(RF): 4.5457—4.5456 <br /> Test Duration: 15 Min Each(30)Min <br /> Change in Reading(RF-Rj): .0003-.0001 <br /> Pass/Fail Threshold or +/-0.2 <br /> Criteria: <br /> est Result: x Pass ❑Fail []::Pass: ❑Fail dl!Pass: ❑Fail Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> We replaced the 91 fill bucket. <br />