Laserfiche WebLink
01/04/2011 TUE 16:25 FAX 2094683433 SJC EHD 2001 <br /> L� gal <br /> 19********************* <br /> *** FAX TX REPORT *** <br /> ********************* <br /> TRANSMISSION OR <br /> JOB NO. 3882 <br /> DESTINATION ADDRESS 919094840300 <br /> PSWD/SUBADDRESS <br /> DESTINATION ID <br /> ST. TIME 01/04 16:25 <br /> USAGE T 00' 35 <br /> PGS. 2 <br /> RESULT OR <br /> San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> 2 600 East Main Street Donna Heran,REHS <br /> N Stockton, California 98202-3029 PROGRAMcooRD/NAroRs <br /> ` Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> i <br /> 0. Kasey Foley,REHS <br /> r F o R Website:www.sjgov.org/ehd Linda Turkatte,REHS <br /> Phone: (209)468-3420 <br /> January 4, 2011 Fax: (209)464-0138 <br /> Holly Mendez <br /> Jones Covey Group, Inc. <br /> 9595 Lucas Ranch Road#100 <br /> Rancho Cucamonga, CA 91730 <br /> Re: Pilot-Flying J#617 15237 N.Thornton Rd. Lodi, CA 95242 SR0061692 <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for a permit to replace the penetration boots at UDC 13, 14/15, 16/17, 21 main, <br /> 21 satellite, replace the 91 fill bucket, and replace torn secondary test boots at UDC 13, 16, 28, <br /> 21, and#3 diesel sump on the underground storage tank(UST)system at the above noted <br /> address. The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Aris Cacapit at(209)468-3453 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Corrosion protection:Verify corrosion protection for direct bury spill bucket prior to <br /> backfilling. <br /> b. Spill bucket test:Verify minimum 5-gallon capacity and pass a one hour hydrostatic <br /> test(or equivalent). Proper drainage must also be verified. <br /> c. 24-hour hydrostatic test(or equivalent)on UDC 13, 14/15, 16/17, 21 main, and 21 <br /> satellite. <br /> 4. Since concrete will be broken near the 91 UST, a secondary containment test must be <br /> performed on the 91 UST once concrete is poured in accordance with the <br /> manufacturer's Quidelines. <br />