My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JAN 2011-JUN 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_JAN 2011-JUN 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:46 AM
Creation date
6/23/2020 6:59:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JAN 2011-JUN 2011
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0517272_15237 N THORNTON_JAN 2011-JUN 2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F_ <br />L <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [4 NO [ ] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for <br />each person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health <br />and Safety Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram <br />drawn to scale showing location of repairs and/or replacements. If repairing a component, describe how this will <br />be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST <br />Installation Application pages 4-8 as necessary for a timely plan review): <br />Remove existing Omnitec panel and switch to Veeder Root as well as the TLM Probes. Remove existing standard wiring and install <br />Belden shielded cable per Veeder Root requirements to all probe locations. Install conduit and wiring needed from former <br />Omnitec panel location to Veeder Root panel as well as the Andy box control box. Install new Veeder Root TLM probes with <br />cap and ring kits. Connect the new wiring to the Veeder Root panel and new probes. Upgrade the Veeder Root panels by <br />installing TCP/IP cards for remote communication capability as well as required modules to enable proper TLM function. <br />Fire up station and ensure proper operation. Connect the Veeder Root panel to Andy box and ensure proper communication. <br />Perform Monitor Certification in completion of project. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />Probe with Module : Specification Sheets Attached <br />329356-002 Veeder Root Four -Input Probe Interface Module <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.