My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2022 11:15:56 AM
Creation date
6/23/2020 6:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2371_PR0231881_1812 COLEY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />19 W Qr"N 11M, I" W DkV V- -IkW <br />Ll <br />Page _of _ <br />Test Method Developed By: <br />0 Sump Manufacturer [Z Industry Standard D Professional Engineer <br />D Other lift) <br />Test Method Used: <br />D Pressure <br />D Vacuum 10 Hydrostatic <br />D Other leafy) <br />Test Equipment Used. INCON Sump Tester <br />�Uipmellt, 0.002" <br />PIPING <br />Sump# Sump# <br />Sump# <br />Sump Diameter: <br />I <br />48" <br />., <br />SUMP Depth: <br />58" <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />Hi est hpLmA Penetration: <br />22" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />is" <br />Condition of sump prior to testing.- <br />Good <br />Portion Of SUMP Tested, <br />2" above <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />OYes ON6®NA <br />DYes ON60NA [3Yes DNoDNA <br />DYes ONoONA <br />product and EqFj?* <br />Turbine shutdo,%m response time <br />N/A <br />N/A N/A <br />Is system programmed for fail-safe <br />shutdown?` <br />D Yes 0 No 0 NA <br />DYes ONo DNA DYes ONo DNA <br />-N/A <br />D Yes D No 0 NA <br />Was fail-safe verified to be <br />operational?* <br />OYes ONo ONA <br />D Yes D No 0 NA 0 Yes [I No 0 NA <br />0 Yes 0 No D NA <br />Wait time between applying <br />pmsum'vacuum/Water and Mr&g <br />30 min <br />test- <br />TestStart Time: <br />9:11 am 9:27 am <br />Initial Reading (14): <br />5.0289" 6.0286" <br />Test End Time: <br />9:26 am 9.42 am <br />Final Reading <br />5.0286" 5.0287" <br />Test Duration: <br />15 min 16 min <br />Change in Reading (RfN: <br />0.0003 0.0001 <br />Pass/Fad Threshold or Criteria: <br />+1-0.002 +/-0.002 <br />0 S 'R& <br />t <br />Piss- <br />�,r* , 70� —01111',,,"� 11 1p 11Fail , <br />Pasti [j Fall <br />Was sensor removed for testing? <br />91 Yes 0 No [INA <br />0 Yes D No [INA D Yes D No OLNA <br />❑ Yes 0 No 0 NA <br />D <br />Was sensor properly replaced and <br />verified functional aft=!2!�3? <br />[Z] Yes 0 No 0 NA <br />11 Yes D No D NA D Yes 1[3 N NA <br />I ill <br />0 Yes D No [INA <br />COMMentS — {include information on repairs made prior to testing, and M2!!Te�ae - for _rfaikd tests) <br />Replaced tam piping penetration. <br />Sensor replaced to lowest point but not tested <br />
The URL can be used to link to this page
Your browser does not support the video tag.