Laserfiche WebLink
S WRCB,January 2002 Page of <br /> 4, SPILL/OVERFILL CONTAINMENT BOXES— <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ X r <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ 1 -!T1 ---` <br /> Test Method Developed By: F.1 Spill Bucket Manufacturer dustry Standard H Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure El Vacuum C rostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> ? Spill Box# t ( Spill Box# Pt tr Spit!Box# 3 Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: ! !C( <br /> Wait time between applying <br /> pressure/acuum/A ater and at JCA p <br /> starting test: <br /> Test Start Time: ��- <br /> Initial Reading(Ri): 7 e e 7 `• ?[ ' <br /> Test End Time: Cl c f ap <br /> Final Reading(Rr): <br /> Test Duration: --_ C7 yy�K 0 Al c d I'% e vt <br /> Change in Reading(RF-RI).- <br /> Pass/Fail <br /> Rr-RI):Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ass ❑Fail Pass ❑Fail Irfass ❑Fail ❑ Pass tl Fall <br /> Comments—(include information on repairs made prior to testing, and recomme)icled follow-acp fi r fcxiled tests) <br />