Laserfiche WebLink
• SWRCB,January 2002 Page of_ <br /> 5. SECONDARY PIl'E TESTING <br /> Test Method Developed By: ❑Pipithg Manufacturer ,Industry Standard ❑Professional Engineer <br /> ❑Other(Spec). <br /> Test Method Used: Xyressure ❑Vacuum ❑ Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Rup# Piping un# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: J- r <br /> Product Stored: u -� <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: lQ," �/�,a� 3*6d <br /> Initial Reading(RI): <br /> Test End Time: lf�� a// / !,1 <br /> Final Reading(RF): X47 <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: COP <br /> Test Result.. Pass ❑Fail t A Pass ❑Fail Pass ❑Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />