Laserfiche WebLink
Q, <br /> ( <br /> Ni . A <br /> MW-58 <br /> WOV7 <br /> 0 80 160 <br /> APPROXIMATE SCALE IN FEET MW-57 <br /> DP-27 -------- <br /> 0 Q5 <br /> DP-28 <br /> mik"'.u, MW-35 Q51MW_51 MW-42k <br /> (D — eMW-48 DP-2? <br /> DP-29 <br /> IiZ 43 <br /> Q5 OW-2 <br /> MW 00MPE-1 @ODP-22 MW47 <br /> OW_1* ODP-23 <br /> @0_w_3 <br /> Ow '@ <br /> MVV-49 DP-2COLLECTION TRENCH r �l ! ;IYI,t,,fl f <br /> 0 6(D MPE-2609_ MW-59 <br /> M DP-24 <br /> -56 <br /> W <br /> tz <br /> MW-h2 <br /> (i lriitr 5C <br /> M --- <br /> G --- <br /> WE-1 EXCAVATION 1 1t <br /> c r <br /> t <br /> L & M OU <br /> U N10' <br /> - tit --- <br /> G1W <br /> AlE-2 <br /> t <br /> -24 <br /> MW <br /> n" <br /> L k I <br /> 0 <br /> �0 01MW <br /> MW-16 <br /> LEGEND: MORTON OU <br /> A-ZONE GROUNDWATER MONITORING WELL PROPOSED GROUNDWATER EXTRACTION WELL <br /> 0 mw_1 B-ZONE GROUNDWATER MONITORING WELL t UR <br /> 0 <br /> C-ZONE GROUNDWATER MONITORING WELL PROPOSED CPT/LIF BORING <br /> mD-ZONE GROUNDWATER MONrFORING WELL @ PROPOSED MULTIPHASE EXTRACTION WELL <br /> DUAL PHASE EXTRACTION WELL @ PROPOSED OBSERVATION WELL FOR: PARCEL 2A AND SITE PLAN WITH PROPOSED MPE, FIGURE: <br /> DESTROYED MONITORING WELL SURROUNDING AREAS <br /> PROPOSED CONTINUOUSLY AND DIRECT PUSH BORING OBSERVATION WELLS, PROPOSED <br /> SPH;ESTIMATED EXTENT AT WATERFRONT WEST WEBER AVENUE AND 3 <br /> TOWERSAREA. DIRECT PUSH BORINGS,AND <br /> NORTH LINCOLN STREET <br /> (SEPARATE PHASE HYDROCARBONS) STOCKTON,CALIFORNIA UNOCAL EXTRACTION WELLS <br /> NOTE: SITE WELLS WERE RE-SURVEYED BY STANTEC BETWEENJOB NUMBER: BY: CHECKED BY: APPROVED BY: DATE: <br /> SEPTEMBER AND DECEMBER 2008 StanW 211402154,200.250 F�MDR TG DS 02/11110 <br /> FILEPATH:M:\Parcel 2aVAUTOPOST 20101HISTORICAU�FIG 2-PARCEL2A-SITE PLAN-EXCAVATION.dwg I Layout Tab:11 x17-COLOR I Drafter.m1rarntrez I Mar 01,2010 at 8:33 <br />