Laserfiche WebLink
PROJECT: SOUTH PARCEL --F <br /> g of Boring TR-4 PAGE 1 OF 1 <br /> Stockton, California <br /> Boring location: See Figure 2,Site Plan <br /> Date started: 10!4/96 1 Date finished: 10/4/96 NOTES: Logged by P. Cusack <br /> Drilling method: 8-inch O.D. hollow-stem au er <br /> Hammer weight: 140 lbs. Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLES <br /> i (7 <br /> m E a$ 'o ; MATERIAL DESCRIPTION <br /> N <br /> t m N 6 N O <br /> m <br /> N <br /> SILTY SAND with CLAY (SM) <br /> light brown, loose, dry <br /> 2 18/ 1/2.5 0.4 17 SM no odor <br /> 3 17 <br /> 4 <br /> SILTY CLAY (CL) <br /> 5 dar gray, moist, hydrocarbon odor <br /> 6 18/ 2/6.5 679 9 <br /> 7 <br /> 16 CL <br /> 8- <br /> 9- <br /> 10— <br /> Bottom <br /> 910Bottom of boring terminated at a depth of 10 feet. <br /> 11 Groundwater was not encountered. <br /> 12 Boring backfilled with cement/bentonite grout. <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17— <br /> is- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27- <br /> 26- <br /> 29- <br /> 30 <br /> 31415161718192021222324252627282930 <br /> ymc1VWdEA0110 Project No.2003.02 Figure 3d <br />