Laserfiche WebLink
IdL <br /> PROJECT: SOUTH PARCEL Log of Boring TR-8 <br /> Stockton, California - PAGE 1 OF 1 <br /> Baring location: See Figure 2,Site Plan <br /> NOTES: Logged by P. Cusack <br /> Date started: 10/4/96 1 Date finished: 10/4/96 <br /> Drilling method: 8-inch O.D. hollow-stem auger <br /> Hammer weight: 140 lbs. I Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLES <br /> I r r <br /> ~ N ma S 7 <br /> a m > ^ z om m m o <br /> m b E m o y i MATERIAL DESCRIPTION <br /> � yE m <br /> y <br /> SILTY SAND with GRAVEL (SM) <br /> brown, loose, dry <br /> 2 18/ 1/2.5 0 19 SM <br /> 3 10 <br /> 4 <br /> SILTY SAND with CLAY (CL) <br /> 5 brown, fine, moist <br /> 6 18/ 2/6.5 0 6 <br /> 7 <br /> 14 CL <br /> 8 color change to dark gray, no odor <br /> 9- <br /> 10— <br /> Bottom <br /> 10Bottom of boring terminated at a depth of 10 feet. <br /> 11 Groundwater was not encountered. <br /> 12Boring backfilled with cement/bentonite grout. <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17— <br /> is- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27- <br /> 28- <br /> 29- <br /> 30 <br /> 31415161718192021222324252627282930 <br /> Treadwell&ROND Project No.2003.02 Figure 3h <br />