Laserfiche WebLink
PROJECT: SOUTH PARCEL Log of Boring TR-17 <br /> Stockton, California <br /> PAGE 1 OF 1 <br /> Boring location: See Figure 2, Site Plan <br /> Date started: 10/7/96 1 Date finished: 10/7/96 NOTES: Logged by P. Cusack <br /> Drilling method: B-inch O.D. hollow-stem auger <br /> Hammer weight: 140 lbs. I Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLES <br /> F Z > 0 <br /> d m m_ a a o O <br /> I as= ' E MATERIAL DESCRIPTION <br /> c N <br /> SILTY SAND with GRAVEL(SM) <br /> brown, loose, moist, no odor <br /> 2 18/ 1/2.5 0 31 SM <br /> 3 18 <br /> SILTY SAND with CLAY (CL) <br /> 4— brown, moist, no odor <br /> 5- <br /> 6— 18/ 2/6.5 0 8 <br /> 7 16 CL <br /> 8- <br /> 9- <br /> 10— <br /> Bottom <br /> 910Bottom of boring terminated at a depth of 10 feet. <br /> 11 Groundwater was not encountered. <br /> 12Boring backfilled with cement/bentonite grout. <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27- <br /> 28] <br /> 3141516171819202122232425262728 <br /> 29 <br /> 30 <br /> T'eadmIER010 Project No.2003.02 Figure 3q <br />