My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1ST QUARTER 2008 SITE STATUS REMEDIAL SUMMARY AND GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
666
>
2900 - Site Mitigation Program
>
PR0519031
>
ARCHIVED REPORTS_1ST QUARTER 2008 SITE STATUS REMEDIAL SUMMARY AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2020 7:03:37 PM
Creation date
6/24/2020 2:19:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1ST QUARTER 2008 SITE STATUS REMEDIAL SUMMARY AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0519031
PE
2960
FACILITY_ID
FA0014239
FACILITY_NAME
PARCEL 2A - TIDEWATER STOCKTON
STREET_NUMBER
666
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95670
APN
13737002
CURRENT_STATUS
01
SITE_LOCATION
666 WEBER AVE
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E CO R <br /> • Since May 31, 2007 the 750 scfm SVE and ASVE vapor abatement system has been operated <br /> under SJVAPCD ATC number N-4878-2-0. <br /> The ASVE system has removed approximately 1,691 pounds (277 gallons) of TPHg, 0.13 <br /> pounds (0.02 gallons) of benzene, and 0.00 pounds (0.00 gallons) of MtBE from soil vapor <br /> beneath the Delta View Apartments to date. For 1Q08, the ASVE system removed <br /> approximately 211 pounds (35 gallons) of TPHg, 0.00 pounds (0.00 gallons) of benzene, and <br /> 0.00 pounds (0.00 gallons) of MtBE. <br /> Historical ASVE system operations and analytical data are presented in Tables 19 through 21. <br /> 5.3 SVE System <br /> The SVE system has run near continuously since May 31, 2007 following retrofit construction <br /> that began on December 12, 2006. The SVE system is comprised of horizontal vapor wells: <br /> SVE-1 through SVE-11, a 100-gallon liquid/vapor separator, and a Solleco 500 cfm vapor <br /> extraction system with a Roots URAI 59 20-hp positive displacement blower. Vapor from both <br /> the ASVE and the SVE system is abated with a 750 scfm thermal oxidizer. <br /> Since May 31, 2007 the 750 scfm SVE and ASVE vapor abatement system has been operated <br /> under SJVAPCD ATC number N-4878-2-0. <br /> The SVE system has removed approximately 1,868 pounds (306 gallons)of TPHg, 0.14 pounds <br /> • (0.02 gallons) of benzene, and 0.00 pounds (0.00 gallons) of MtBE from soil vapor beneath the <br /> L&M OU to date. For 1Q08, the SVE system removed approximately 98.6 pounds (16.2 <br /> gallons) of TPHg, 0.02 pounds (0.00 gallons) of benzene, and 0.00 pounds (0.00 gallons) of <br /> MtBE. <br /> Historical SVE system operations and analytical data are presented in Tables 22 through 25. <br /> • <br /> 1 Q08QSSRQRSRQMR.Final.doc 28 April 30,2008 <br /> 77TW.26397.42.1307 <br />
The URL can be used to link to this page
Your browser does not support the video tag.