Laserfiche WebLink
Stantec <br /> L & M OPERABLE UNIT-THIRD QUARTER 2010 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> October 27, 2010 <br /> 7.0 Limitations <br /> This report presents our understanding of existing conditions at the subject Site. The <br /> conclusions contained herein are based on the analytical results, and professional judgment in <br /> accordance with current standards of professional practice; no other warranty is expressed or <br /> implied. Stantec assumes no responsibility for exploratory borings or data provided or reported <br /> by other consultants or contractors. Wallace-Kuhl monitors and samples wells MW-3, MW-5, <br /> MW-6 through 8, MW-11, MW-37 through 39, BMW-1, and 2AMW-15 on behalf of the City of <br /> Stockton Redevelopment Agency and provides preliminary data for use in this report. Stantec <br /> assumes that the finalized data gathered for the UOU and MOU on the behalf of the RDA during <br /> the third quarter 2010 will be submitted by Wallace-Kuhl under separate cover. <br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Reports\QMR\2010\3010\3010QSSRORSROMR Stockton_FINAL.doc 7.1 <br />