Laserfiche WebLink
Stante Zancho Cordova Office Stantec Conso 'ging Corporation 73 3ZZ <br /> .3017 Kilgore Road Stantec Company Contact(s)for Invoict. = :PROJECT No :: DATE: <br /> Rancho Cordova, CA Dan Schreiner,Stantec Project Manager PAGE. 7-;�o -� <br /> 211402828.300.250 9 of 16 <br /> TEL: (916) 861-0400 FAX: (916)861-0430 email -anthony.giglini@stantec.com; cc:kristen.burba@stantec.com <br /> Project Name: Sampler(s):Printed Name Lab <br /> 1Q10 Monitoringand Sampling Event <br /> Address: KIFF ANALYTICAL <br /> Parcel#2A SAMPLER(S):(SIGNATURE) V ;l3SE;(3NLY <br /> W.Weber at N.Lincoln,Stockton, CA <br /> ❑ E <br /> TURNAROUND TIME(BUSINESS DAYS) <br /> F-110 DAYS ® 5 DAYS ❑ 72 HR ❑ 48 HR ❑ 24 HR ❑ <24 HR REQUESTED ANALYSIS <br /> 5-Day(Standard TAT) uP in <br /> o <br /> ~m L O <br /> SPECIAL INSTRUCTIONS OR NOTES: TEMPERATURE ON RECEIPT(C) m0 m <br /> ma w a Z <br /> ,o w <br /> EDF Deliverable. Please use the following reporting limits: c <br /> cw <br /> 0 a r O <br /> VOC's-0.5 ppb;TPHg/TPHd/TPH motor oil-50 ppb; v D o R <br /> BTEX/MtBE/DIPE/TAME/EtBE-0.5 ppb;TBA-5 ppb, Ethanol-50 ppb, Methanol- 0 a E <br /> 100 ppb m a <br /> SAMPLING m W m .. <br /> s Field Sample Identification DATE TIME MAT-RIX NCOONT. vaesav <br /> ee a d « 0 <br /> N a o <br /> C7NLY: v w co t— 00 <br /> QCEB-1-RM Water 9 HCI X X X <br /> rz- <br /> Vater 9 H X <br /> erx X X <br /> a er <br /> Water, rr <br /> Relinquished by:(Signature) Received by:(Signature) Time <br /> Relinquished by:(SignaturW Received by:(Signature) Time: <br /> !yOC 4 91 <br /> Relinquished by:(Signature) Ad 4by��igr ! o O Ti <br /> N n t J <br /> O <br /> W <br /> O <br /> N <br /> O <br /> QI <br />