Laserfiche WebLink
Quarterly Groundwater Monitoring Report - First Quarter 2016 <br /> L&M Operable Unit-West Weber Avenue and North Lincoln Street, Stockton, CA <br /> April 29, 2016 <br /> • <br /> 3.0 Remedial Systems Status <br /> 3.1 DUAL PHASE EXTRACTION SYSTEM <br /> The on-site dual phase extraction (DPE) system has been shut down since March 27, 2014. <br /> Historical operational data is provided in Appendix D. In a letter dated April 7, 2014 the RWQCB- <br /> CVR requested submittal of a proposal to remove the existing DPE remedial equipment while <br /> leaving pertinent infrastructure in place to allow for response with a mobile treatment unit if <br /> necessary. Stantec submitted a Remediation Equipment Removal Proposal dated May 30, 2014 <br /> and additionally proposed to temporarily retain the groundwater extraction and treatment <br /> (GWET) portion of the DPE system for processing M&S purge water and any additional <br /> groundwater generated by future remedial efforts. Stantec received approval from the <br /> RWQCB-CVR in a letter dated November 2, 2014. Stantec removed the remediation system <br /> between January 12 and 14, 2015. Details of the removal of the remediation system are <br /> discussed below. <br /> 3.1.1 DPE System Removal Activities <br /> Between January 12, 2015 and January 14, 2015, Stantec oversaw JHA Remediation of <br /> Sacramento, CA disassemble and remove the soil vapor extraction (SVE) components of the <br /> DPE system from the Site. The GWET components were left in place for use in processing Site <br /> monitoring and sampling purge water. <br /> 3.1.2 DPE (Groundwater) Operational and Analytical Data - 1Q16 <br /> The GWET portion of the DPE system is the only remediation system that remains on-Site. During <br /> the 1Q16, the GWET system was used to process purge water generated during Site monitoring <br /> and sampling event. <br /> On January 14, 2016 approximately 985 gallons of purge water associated with the 1 Q16 M&S <br /> event was processed by the GWET system. This resulted in the recovery of 0.003 lbs (0.0004 <br /> gallons) of TPHd and 0.001 lbs (0.0002 gallons) of TPHo and 0.0004 lbs. (0.0001 gallons) TPHg. No <br /> appreciable amount of MTBE,TBA, or benzene was recovered during 1 Q16. <br /> Historic DPE system operating, analytical and mass recovery data can be found in Appendix D. <br /> 3.1.3 Historic DPE Mass Removal (Groundwater) <br /> Since startup on March 18, 2004 the groundwater portion of the DPE system has treated <br /> approximately 7,307,672 gallons of water resulting in the recovery of approximately 153 lbs (25 <br /> gallons) of TPHg; 9,572 Ibs (1,333 gallons) of TPHd; 5,154 lbs (676 gallons) of TPHo; 0.08 lbs (0.01 <br /> gallons) of benzene; 0.03 lbs (0.005 gallons) of MTBE; and 0.58 lbs (0.09 gallons) of TBA. <br /> • <br /> ® Stantec 9 <br />