Laserfiche WebLink
QUARTERLY GROUNDWATER MONITORING REPORT- FIRST QUARTER 2016 <br /> L&M Operable Unit -West Weber Avenue and North Lincoln Street, Stockton, CA <br /> Appendix B <br /> IsPage 7 <br /> removal from soil and groundwater beneath the L&M OU. Remedial system <br /> upgrade installation activities were completed during the second quarter 2007. <br /> Beginning on September 1, 2006 SPH is periodically extracted from a select <br /> group of L&M OU monitoring wells that have had consistent SPH thickness over <br /> recent quarters. Extraction is performed on groundwater wells MW-4, MW-10, <br /> MW-17, MW-19, MW-40, MW-43, MW-47, MW-48, MW-49, and MW-52. SPH levels <br /> were monitored for four weeks following the initial extraction event. <br /> In September 2006, SECOR, along with Entact Environmental Services, <br /> commenced pipeline abandonment and removal activities at 525 West Weber <br /> Avenue in the Waterfront Towers Parking facility in accordance with Stantec's <br /> Pipeline Removal, Abandonment, Soil Excavation, On-Site Horizontal SVE Well <br /> Installation, and Horizontal SVE Well Installation Beneath Delta View Apartments <br /> Report and Work Plan for Pipeline Removal, Abandonment, and Soil Excavation <br /> in Waterfront Towers Parking Lot dated February 10, 2005. A report entitled <br /> Pipeline Removal, Abandonment, Soil Excavation, and Parking Lot <br /> • Reconstruction summarizing remedial activities and parking lot restoration at the <br /> Waterfront Towers Parking facility was submitted on June 25, 2008. <br /> On May 31 , 2007, optimization of the DPE/SVE system, in accordance with <br /> SECOR's Work Plan for Additional DPE Feasibility Testing and Expanded Remedial <br /> System Installation, dated January 4, 2006, was completed and permitted to <br /> operate by the city of Stockton. A soil vapor extraction system start-up and dual <br /> phase augmentation report was submitted on June 25, 2008. <br /> On June 21 , 2007, well MW-6 on the MOU was destroyed and abandoned on <br /> behalf of the City of Stockton and under the supervision of Golden State <br /> Environmental due to planned excavation and construction activities. <br /> From July 28 through September 26, 2008, additional assessment activities were <br /> conducted at the Site. Five B-zone groundwater monitoring wells (MW-56 <br /> through MW-60), seven C-zone groundwater monitoring wells (MW-61 through <br /> MW-67), and seven D-zone groundwater monitoring wells (MW-68 through MW- <br /> 74) were installed. Results were summarized in Stantec's Additional Deep <br /> Groundwater Zone Assessment Report dated January 26, 2009. <br /> • In November 2008, Treadwell and Rollo (T&R) on behalf of the City of Stockton <br /> abandoned monitoring wells MW-8, MW-10, MW-11 , MW-39, MW-40, MW-41, and <br /> ® Stantec <br />