Laserfiche WebLink
QUARTERLY GROUNDWATER MONITORING REPORT—FIRST QUARTER 2016 <br /> L&M Operable Unit—West Weber Avenue and North Lincoln Street, Stockton, CA <br /> Appendix B <br /> Page 13 <br /> • By June 15, 2016 submit a Conceptual Site Model for the L&M Operable <br /> Unit. <br /> Stantec submitted a Soil Vapor Extraction System Pulsing and Rebound Testing <br /> Plan to the CRWQCB dated March 14, 2016. The plan described how Stantec <br /> will utilize the existing SVE infrastructure and bring out a mobile remediation <br /> trailer to conduct the SVE pulsing and rebound testing, including a sample <br /> collection schedule. <br /> • <br /> • <br /> ® Stantec <br />