Laserfiche WebLink
Historical SPH Batch Extraction Tracking <br /> Parcel 2A-L&M OU <br /> 666 West Weber Avenue,Stockton, CA <br /> betore Extraction Atter Extraction <br /> Diameter Depth toja <br /> pth to Depth of Vol of Depth to Depth to Depth of Vol of <br /> Date Monitoring of Well Productter Product Product Product Water Product Product <br /> am led Well Notes in ftft <br /> al ft ' :ft ft al <br /> 9/28/2006 MW-4 2 No Sheen 12.19 <br /> 9/28/2006 MW-10 2 Sheen 15.87 <br /> 9/28/2006 MW-17 2 24.20 21.61 2.59 0.42 <br /> 9/28/2006 MW-19 2 No Sheen 14.41 - - <br /> 9/28/2006 MW-40 2 20.88 23.10 2.22 0.36 <br /> 9/28/2006 MW-43 2 17.30 23.22 5.92 0.97 <br /> 9/28/2006 MW-47 2 No Sheen 20.34 - - <br /> 9/28/2006 MW-48 2 17.80 17.90 0.10 0.02 <br /> 9/28/2006 MW-49 2 15.19 37.35 22.16 3.61 <br /> 9/28/2006 MW-52 2 21.40 21.90 0.50 0.08 - - - <br /> 11/14/2006 MW-4 b 2 Sheen 12.36 - - <br /> 11/14/2006 MW-10 b 2 16.00 16.01 0.01 0.00 - - - - <br /> 11/14/2006 2AMW-13 b 2 Sheen 13.14 - - <br /> 11/14/2006 MW-17 b 2 Sheen 21.23 <br /> 11/14/2006 MW-19 b 2 Sheen 14.62 - - <br /> 11/14/2006 MW-40 b 2 20.52 22.75 2.23 0.36 - - - - <br /> 11/14/2006 MW-43 b 2 16.31 29.45 13.14 2.14 <br /> 11/14/2006 MW-47 b 2 Sheen 19.84 - _ _ <br /> 11/14/2006 MW-48 b 2 16.98 18.79 1.81 0.30 - <br /> 11/14/2006 MW-49 b 2 14.12 43.97 29.85 4.87 - - - - <br /> 11/14/2006 MW-52 b 2 21.42 21.45 0.03 0.00 - - - _ <br /> . 2/3/2007 MW-4 2 Sheen 13.10 13,18 _ <br /> 2/3/2007 MW-10 2 Sheen 16.78 - 16.85 - <br /> 2/3/2007 2A-MW-13 2 13.78 14.45 0.67 0.11 - 13.55 - - <br /> 2/3/2007 2A-MW-14 2 13.00 13.50 0.50 0.08 13.22 13.39 0.17 0.03 <br /> 2/3/2007 MW-17 2 21.56 21.56 0.60 0.00 - 21.60 - - <br /> 2/3/2007 MW-19 2 15.11 16.80 1.69 0.28 - 15.26 <br /> 2/3/2007 MW-40 2 18.45 22.16 3.71 0.61 - 18.34 - - <br /> 2/3/2007 MW-43 2 16.40 31.26 14.86 2.42 18.41 18.63 0.22 0.04 <br /> 2/3/2007 MW-47 2 - - _ _ _ <br /> 2/3/2007 MW-48 2 17.90 20.30 2.40 0.39 18.89 20.99 2.10 0.34 <br /> 2/3/2007 MW-49 2 14.42 44.40 29.98 4.89 18.65 18.73 0.08 0.01 <br /> 2/3/2007 MW-52 2 22.00 25.60 3.60 0.59 21.90 21.99 0.09 0.01 <br /> 2/3/2007 DPE-3 4 12.40 13.10 0.70 0.46 - 12.51 - - <br /> 2/3/2007 DPE-6 4 13.00 13.50 0.50 0.33 13.22 13.39 0.17 0.11 <br /> 2/3/2007 DPE-7 4 13.45 13.75 0.30 0.20 12.55 12.57 0.02 0.01 <br /> 2/3/2007 DPE-11 4 12.58 15.15 2.57 1.68 - - - _ <br /> 2/3/2007 DPE-12 4 13.10 15.70 2.60 1.70 - 13.26 - - <br /> • <br /> \\US1345-F03\workgroup\1857\active\185750217\05_report_deliv\dwgs_design\tables\O&M Tables 2015\4015\Parcel 2A OM Tables 4015.klapge 43 of 69 <br />