Laserfiche WebLink
05M GETTLER - RYAN INC. <br /> WELL MONITORING/SAMPLING <br /> FIELD DATA SHEET <br /> Client/Facility(/: Parcel 2A Job Number 385901 <br /> Site Address: 666 West Webster Avenue Event Date: I I I — (inclusive) <br /> City: Stockton, CA Sampler: �W <br /> Well ID Date Monitored: 1-41-416 <br /> Well Diameter 2 in. Volume 3/4*=0.02 r"=0.04 2•=an <br /> Total Depth 2,421-SL ft. Factor(VF) 4^=066 5=1.02 6'= 1.50 1z=s.eo <br /> Depth to Water I 1 r,SO ft. ❑ Check if water column is less then 0.50 ft. <br /> xVF = x3 case volume=Estimated Purge Volume: gal. <br /> Depth to Water w/80% Recharge[(Height of water column x 0.20)+DTWI: <br /> Time Started: (2400 hrs) <br /> Purge Equipment: Sampling Equipment Time Completed-._(240D hrs) <br /> Disposable Bailer Disposable Bailer Depth to Product: ft <br /> Stainless Steel Bailer Pressure Bailer Depth to Water. ft <br /> Stack Pump Metal Fitters Hydrocarbon Thickness: ft <br /> Visual co stion/Description: <br /> Peristaltic Pump Pedsta8lc Pump <br /> QED Bladder Pump QED Bladder Pump Ski Wert Absorbent Sock(circle one) <br /> Other: Other: t Removed from Skimmer. Itr <br /> . Amt Removed from Well: Itr <br /> Water Removed: ftr <br /> Start Time(purge): Weather Conditions: <br /> Sample Time/Date: / Water Color: Odor: Y / N <br /> Approx, Flow Rate: gpm. Sediment Descr' tion: <br /> Did well de-water'? If yes, Time: V me: gal. DT <br /> W @Sampling: <br /> Time ConductHity Temperature D.O. ORP <br /> (2400 hr.) Volume(gal.) pH (pS/mS ( C / F ) (mg/L) (MV) <br /> pmhos/ ) <br /> LABORATORY INFORMATION <br /> SAMPLE ID (3)CONTAINER VIFRIG. PRESERV.TYPE LABORATORY ANALYSES <br /> x voa vial 7 YES HCL PACE TPH-HO/TPH-DRO(8015M)TPH-GRO/ <br /> BTE)(+MTBE(8280)/TBA(8260B) <br /> x 250m1 YES HNO3 PACE DISSOVLED ARESENIC(EPA 800017000) <br /> *OMMENTS: I-1 Al <br /> AddlReplaced Gasket: Add/Replaced Bolt: Add/Replaced Lack: AddlReplaced Plug: <br />