Laserfiche WebLink
Quarterly Groundwater Monitoring Report- First Quarter 2016 <br /> L&M Operable Unit- West Weber Avenue and North Lincoln Street, Stockton, CA <br /> April 29, 2016 <br /> 2.0 Groundwater Monitoring and Sampling <br /> 2.1 SITE INFORMATION <br /> Current phase of project: Groundwater monitoring and sampling <br /> Quarterly: <br /> MW-9, MW-16 through 20, MW-42, MW-43, MW-46 <br /> through MW-52, MW-54, MW-55, MW-57, MW-59, MW-60, <br /> MW-62 through MW-74, 2AMW-12 through 2AMW-14 <br /> L&M Operable Unit frequency of Semi-annually (1 Q/3Q): <br /> monitoring and sampling: MW-21, MW-22, MW-31, MW-56, MW-58, MW-61 <br /> Annually (3Q): <br /> MW-23 through MW-28, MW-34, MW-35, MW-44, MW-45 <br /> (MW-9, MW-18 through MW-23, MW-25, MW-28, MW-31, <br /> MW-34, MW-45, 2AMW-12 through 2AMW-14; <br /> additionally sampled for Arsenic during 34 <br /> Sheen: <br /> MW-4, MW-10, 2AMW-13, MW-19, MW-39, MW-17, <br /> Have separate-phase hydrocarbons MW-47, and MW-50. <br /> (SPH) historically been found on- <br /> site?: SPH: <br /> 2AMW-14, MW-21, DIRE-1 through DPE-12, MW-40, <br /> MW-43, MW-48, MW-49, and MW-52 <br /> See Appendix D for historical analytical data SPH <br /> Historic range in DTW (ft below top of <br /> casing [TOC] from February 1992 to 6.91 (MW-23, 2Q06) to 45.12 (MW-50, 4Q11) <br /> January 2016 : <br /> Water supply wells within a 2,000-foot No known water wells within 2,000 feet of Site. Stantec <br /> radius and their respective direction: Department of Water Resources Survey 2013. <br /> On-Site: <br /> Soil Vapor Extraction (SVE); Groundwater Extraction and <br /> Current remediation techniques: Treatment (GWET) system-Not operational <br /> Off-Site: <br /> Product recovery skimmers stem-Operational <br /> 2.2 WORK PERFORMED <br /> Stantec contracted Gettler-Ryan Inc. (G-R) to gauge 48 and sample 33 groundwater monitoring <br /> wells between January 11 through 13, 2016. Wells 2AMW-13, MW-19, MW-47 and MW-52 were <br /> monitored, but not sampled due the presence of Sheen or SPH in the wells. Wells 2AMW-14, <br /> MW-43, and MW-48 through MW-50 were neither monitored nor sampled during 1 Q16 due to the <br /> >� presence of product recovery skimmers in the wells. These wells will be monitored and sampled <br /> ® Stantec 4 <br />