Laserfiche WebLink
CERS Consolidated I'mcrgency Ikespollse/Contlilgency MR11 <br /> 1 ERNAI.FACII.II'Y EMGR(if.NCY COMMl1NICA'IlONS Olt ALARM NO1111CA'lION WII,I,(1C(;Ilit IIY(Chcck I'll Ih:,I apply) 0I <br /> 1. IER)AI.WANINGS; ❑2.1'1111LIC1 AS1D'SD'II'INNM", Olt IN I IMCOM SYS I'I?M; (]f. I I'.I,I"III low:, <br /> IOkI'Allfl ( <br /> AI)fUISC1 4.V1A ; S.ALAln <br /> NOTIFICATIONS TO NI:'IG11110RINU I'AC'lI.II ll?S'll1AT MAY Illi AFFIEC 11'.1)BY AN OFF-811 I,III{LEAVE WILL OC(;(/l(BY((:heck.all that rpply)• err <br /> 14-1.VERNAL WARNINGS; ❑2.1'11111.1C A1)1)1tI�SS 0 1(IN I I?RCUM SY4I NM; L)3 'I'll,TI'l 101W, <br /> ❑4.PAGERS-, ❑5.ALARM SYS ITM, [__16 POPTAIIIJ MINO <br /> Eh1ERGENCY COORDINATOR CON I'A(:I'INFORM Al 1 cu <br /> PRIMARY EAIERGIENCY COOItDINA'11)It NAhili:3eaA 3a�\aN 11 PI IONE NO.:a°1 6 3 q ���� PHONI:t10,: <br /> ALTERNATE EMERGI"NCY COORDINA'FOIt NA MF,:A34fty_ -tk\r!J f I IONE NO.:aM la 60,51 PHONE NO.: <br /> ❑Check if additional Emergency C-rdinator contact nod address infonnntion is nvnilnble onsite or by calling, P)PONE NO.: <br /> Note:if more than one alternate emergency coordinator is designated,attach a list in order ortesponsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check ttie appliesble bores to indicate)-our facility's procedures for containing spills nod preventing and mitigating releases,fires and/or"plosions <br /> LI <br /> 4;§-1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,CCC.; <br /> R2.(� <br /> PROVIDE STRUCTURAL.PHYSICAL BARMERS(e.g.,Portable spill containment walls,built-in berms); <br /> 3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> ❑d. COVER OR BLOCK FLOOR ANLVOR STORM DRAINS; <br /> �TS. LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> �. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> QA STOP PROCESSES ANWOR OPERATIONS; <br /> [:19" <br /> 9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> [110.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> )9]1.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> f;jL12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> 903.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ❑ 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ❑ IS.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> 16,TARE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE, <br /> ❑20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> a. <br /> 021.OTHER(Spactfyr <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): er_ <br /> 01. BELS; <br /> 2. HORNS/SMENS; <br /> . VERBAL(Le,Shoutingr <br /> 4. OTHER S <br /> MMFOUMMG LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street comer): <br /> Not=The Emagericy Coordinator must account for all onsite employees and visitors after evacuation_ <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br /> O 1.WRrrIENPROCxX)URES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> 1 �2.EVACUA17ON MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS, <br /> :0j-�." l�ffit(gpecily) Es. <br /> f <br /> NOiK10 iovtiodProeedtrres VWM/ enapls dmdd be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EML'IZGENCY SERVICES <br /> ARRANGEMWM FOR LOCAL Etv1ERGENCY SERVICES(Check one of the following): Ft. <br /> DMZKMINED NOT NECESSARY; <br /> `,u ARRANGEMEN T5 HAVE BEEN MADI3(Specil}): F2 <br /> Wilhlocal flim and police deparlmenb,hospitals,slate and local emergency response trams,and/or emergency services <br /> yoi"finility,(fnetxssary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Page 2 of 4 <br /> Scanned by CamScanner <br />