My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
800
>
2200 - Hazardous Waste Program
>
PR0514340
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2020 1:07:41 PM
Creation date
6/25/2020 11:04:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0514340
PE
2227
FACILITY_ID
FA0010472
FACILITY_NAME
Penske Truck Leasing Co., LP
STREET_NUMBER
800
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
CURRENT_STATUS
01
SITE_LOCATION
800 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology Inc . <br /> 11000 N. MoPac Expressway, Suite 500 Austin, TX 78759 ( 800 ) 964- 0010 Policy 100 -29-B <br /> INSPECTOR ONLY Rev : A <br /> SAFETY CHECKLIST - OVF <br /> Site Name/#: Street Address : City, State , and Zipcode: W. O. # <br /> PENSKE CA-043 800 E. Pescadero Ave . Tracy, CA 95376 AST-6703842 <br /> Arrival Time: Departure Time: Travel Time : Others on site : Date : <br /> 10 : 15 : 00 AM CDT 1 : 39: 00 PM CDT Jun 10, 2019 <br /> Scope of Work and Tasks Performed (JSA's must be available for all tasks) : <br /> AST 5 year CA PE inspection . <br /> Repairs to Equipment or Parts Provided : <br /> Follow-up actions required ; equipment isolated ; comments : <br /> PPE - PERSONAL PROTECTIVE EQUIPMENT REQUIRED (Check items used or mark — if not applicable) <br /> N Safety Vest N Safety Glasses N Gloves ❑ Hearing Protection <br /> N Steel Toe Boots ❑ Splash Goggles ❑ Hard Hat ❑ Other <br /> PRE- TEST PROCEDURES (Check each item completed or mark if not applicable) <br /> 1 . N Discuss safety procedures with site personnel . Nearest hospital : <br /> 2 . ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3 . ❑ Secure entire work area with barricades (cones , flags , and caution tape , pennant flags , or other perimeter guard) . <br /> 4 . ❑ Place fire extinguishers and " No Smoking" signs in the work area . <br /> SIGN IN Lead Technician Name Lead Technician Signature <br /> General Safety Checks : <br /> N All site personnel have been informed . Sandra Lawson <br /> ❑ Fuel delivery has been informed . <br /> ❑ Work areas barricaded to protect workers , staff & public. Site Representative Name Site Representative Signature <br /> ❑ Is a fuel delivery due today? Jose Frias <br /> I have discussed job clearance form with technician . <br /> POST- TEST PROCEDURES (Check each item completed or mark if not applicable) <br /> 1 . ❑ Run all pumps and verify there are no leaks : <br /> ❑ Impact Valve Test Ports under dispensers ❑ Leak Detector Threads on STP's ❑ Functional Elements & Relief Screws <br /> 2 , N Confirm location was returned to pre-arrival state <br /> 3 . ❑ Remove barricades <br /> SIGN OUT & Operator Verification of Work (OVF) Lead Technician Name Lead Technician Signature <br /> General Safety Checks : <br /> N Work area has been left tidy & safe Sandra Lawson <br /> ❑ Site staff are aware of work status including any remaining isolation <br /> Site Representative Name Site Representative Signature <br /> N Changes to equipment are documented and communicated <br /> ❑ All incidents , near incidents , and unsafe situations reported Jose Frias <br /> w <br /> Site Representative Comments : <br />
The URL can be used to link to this page
Your browser does not support the video tag.