ABBREVIATIONS PLUMBING SYMBOL LEGEND VALVES PIPING GENERAL PLUMBING NOTES -�
<br /> AFF ABOVE FINISHED FLOOR S OR W SANITARY OR WASTE PIPING ABOVE SLAB GENERAL SOIL,WASTE,AND VENT PIPING 1. PLUMBING CONTRACTOR SHALL COORDINATE WITH THE GENERAL
<br /> AHJ AUTHORITIES HAVING JURISDICTION PLUMBING CONTRACTOR TO PROVIDE VALVES WHERE INDICATED ON SEE SPECIFICATIONS FOR PIPE MATERIALS. ALL HORIZONTAL RUNS CONTRACTOR TO PATCH AND REPAIR ALL EXISTING WALLS, FLOORS,
<br /> r
<br /> APPROX APPROXIMATE ------- - S OR W SANITARY OR WASTE PIPING BELOW SLAB PLANS AND AS NECESSARY FOR PROPER SYSTEM OPERATION AND SHALL DRAIN AT A GRADE OF 1/4"PER FOOT(21 MM PER METER)WHERE CEILINGS OR OTHER SURFACES IDENTIFIED TO REMAIN THAT MAY
<br /> COMPONENT ISOLATION. SEE SPECIFICATIONS FOR TYPES. INSTALL POSSIBLE BUT IN NO CASE LESS THAN 1/8" PER FOOT(10MM PER BECOME DAMAGED DURING THE COURSE OF WORK.
<br /> BLDG BUILDING -------- V VENT PIPING VALVES FOR EACH FIXTURE AND ITEM OF EQUIPMENT. PROVIDE BRAIDED METER)WHERE ALLOWED&SIZED PER AHJ AND CODE.
<br /> GW GW GREASE WASTE STAINLESS STEEL HOSE(UNLESS OTHERWISE NOTED)BETWEEN VALVE 2. EXPOSED/SURFACE MOUNTED PIPING IS ONLY ALLOWED IN THE BAR
<br /> CLG CEILING AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S COORDINATE WITH LOCAL AUTHORITIES FOR DRAINAGE AREA UNDER COUNTERTOPS, WHERE IT DOES NOT OBSTRUCT
<br /> CONST CONSTRUCTION CD CD CONDENSATE DRAIN SPECIFICATIONS. LOCATE SHUT-OFF VALVES ADJACENT TO EQUIPMENT REQUIREMENTS FOR EQUIPMENT DESIGNATED WITH INDIRECT WASTE CABINETS/DEVICES AND WHERE APPROVED BY STARBUCKS
<br /> CW DOMESTIC COLD WATER FOR EASY ACCESS SUCH THAT VALVES CAN BE REACHED WITHOUT TO FLOOR SINKS. INDIRECT DRAIN LINES ARE TO MAINTAIN MIN. 1" CONSTRUCTION MANAGER. IF ROUTED THROUGH CABINETS, IT
<br /> CXA COMMISSIONING AGENT —-—- CW COLD WATER PIPING MOVING EQUIPMENT. SHUT OFF VALVES TO BE BALL TYPE.VALVES SHALL (25MM)AIR GAP ABOVE FLOOR SINKS. PROVIDE PIPED DRAIN (P-TRAP SHALL BE ROUTED TO MAXIMIZE STORAGE SPACE AND BE
<br /> —--—-- HW HOT WATER PIPING BE LISTED/APPROVED FOR USE PER AUTHORITIES HAVING JURISDICTION AND VENT)TO SANITARY IF REQUIRED BY LOCAL JURISDICTION. PROTECTED FROM DAMAGE. ©2020 STARBUCKS COFFEE COMPANY
<br /> DEG DEGREES (AHJ)AND CODE REQUIREMENTS. PROVIDE VALVE IDENTIFICATION PER
<br /> DN DOWN CWF CWF COLD WATER FILTERED THE SPECIFICATIONS FOR MAIN WATER SERVICE SHUT-OFF AND ANY CONDENSATE DRAINAGE PIPING 3. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL INTENT OR STA R B V C KS°
<br /> DTL DETAIL CWN CWN COLD WATER NANO FILTERED OTHER VALVES WHICH ARE NOT CLEARLY EVIDENT WHAT THEY SERVE. THE PLUMBING CONTRACTOR SHALL PROVIDE CONDENSATE DRAINS ARRANGEMENT OF SYSTEM(S). FURNISH AND INSTALL ALL
<br /> DWG(S) DRAWING(S) FOR AIR HANDLING UNITS AND STARBUCKS EQUIPMENT(REFER TO COMPONENTS NEEDED WHETHER INDICATED OR NOT TO PROVIDE A 2401 UTAH AVENUE SOUTH
<br /> CWS CWS COLD WATER SOFTENED SUPPLY WATER SERVICE SCHEDULE). CONDENSATE DRAINAGE PIPING SHALL BE TYPE"M"
<br /> EA EACH IF WATER PRESSURE SUPPLIED TO STORE IS GREATER THAN 65 PSI, COPPER TUBING WITH WROUGHT COPPER SWEAT FITTINGS JOINED COMPLETE AND OPERATING SYSTEM. OVERALL CASEWORK SEATTLE, WASHINGTON 98134
<br /> EC ELECTRICAL CONTRACTOR TW TW TEMPERED WATER PROVIDE A PRESSURE REGULATOR IN MAIN SUPPLY TO REDUCE WATER WITH 50/50 SOLDER. COMPONENT DIMENSIONING ON PLUMBING DETAILS ARE SHOWN (206) 318-1575
<br /> ELEC ELECTRICAL RO RO REVERSE OSMOSIS WATER PRESSURE. PROVIDE BACKFLOW PREVENTION ON WATER SERVICE FOR REFERENCE AND COORDINATION ONLY.
<br /> EMER EMERGENCY IF REQUIRED BY LOCAL CODES. HANGERS AND SUPPORTS THESE DRAWINGS AND THE PROJECT MANUAL
<br /> EXIST EXISTING G G GAS PIPING THE PLUMBING CONTRACTOR SHALL FURNISH ALL PIPE SUPPORTS 4. CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING CLEARANCES ARE CONFIDENTIAL AND SHALL REMAIN THE
<br /> EXT EXTERIOR THERMOSTATIC MIXING VALVE REQUIRED FOR EQUIPMENT AND MATERIAL IN ACCORDANCE WITH REQUIRED BY OTHER TRADES, AND NOTIFY STARBUCKS SOLE PROPERTY OF STARBUCKS
<br /> RD RD REFRIGERANT DISCHARGE PIPING PROVIDE A SINGLE THERMOSTATIC MIXING VALVE(TMV)LOCATED AT HOT SPECIFICATIONS. ALL HORIZONTAL RUNS OF PIPING SHALL BE CONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TO CORPORATION, WHICH IS THE OWNER OF THE
<br /> FD FLOOR DRAIN RS RS REFRIGERANT SUCTION PIPING WATER TANK AND SET FOR 120° (OR AS REQUIRED BY AHJ)TO SERVE SUPPORTED BY PIPE HANGERS INSTALLED AS REQUIRED BY LOCAL PROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO THE FACE COPYRIGHT IN THIS WORK. THEY SHALL NOT
<br /> FS FLOOR SINK HAND SINKS. MIXING VALVE TO BE INSTALLED PER MANUFACTURER'S CODES. ADDITIONAL SUPPORTS SHALL BE PROVIDED WHERE OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE.ALL BE REPRODUCED(IN WHOLE OR IN PART),
<br /> F&I FURNISH & INSTALL REQUIREMENTS WITH CHECK VALVES AT SUPPLY INLETS. PROVIDE REQUIRED TO PREVENT SAGGING. DIMENSIONS TO BE TAKEN FROM ACTUAL BUILDING DIMENSIONS. SHARED WITH THIRD PARTIES OR USED IN ANY
<br /> FLR FLOOR BV BALL VALVE THERMOMETER ON OUTLET OF TMV. SEE SPECIFICATIONS FOR MANNER ON OTHER PROJECTS OR
<br /> FT FOOT/FEET REQUIREMENTS. CONNECTIONS 5. THE PLUMBING CONTRACTOR SHALL COORDINATE PLUMBING WORK EXTENSIONS TO THIS PROJECT WITHOUT THE
<br /> FCO FLOOR CLEANOUT GV GATE VALVE INSTALL UNIONS ADJACENT TO EACH VALVE AND AT FINAL CONNECTION WITH OTHER TRADES. THE ARCHITECTURAL DRAWINGS AND PRIOR WRITTEN CONSENT OF STARBUCKS
<br /> TO EACH PIECE OF EQUIPMENT. INSTALL DIELECTRIC COUPLINGS TO SPECIFICATIONS SHALL TAKE PRECEDENCE OVER ALL OTHER CORPORATION. THESE DRAWINGS AND
<br /> GC GENERAL CONTRACTOR CONNECT PIPING MATERIALS OF DISSIMILAR METALS. DRAWINGS. SEE ARCHITECTURAL DRAWINGS FOR FIXTURES IN SPECIFICATIONS ARE INTENDED TO EXPRESS
<br /> GFCI GROUND FAULT CIRCUIT INTERRUPTER CH.V CHECK VALVE PLUMBING FIXTURES CASEWORK AND PLUMBING DETAILS. SEE SPECIFICATION SHEETS DESIGN INTENT FOR A PROTOTYPICAL
<br /> GW GREASE WASTE CLEANOUTS FOR PLUMBING SPECIFICATION SECTIONS. STARBUCKS STORE (WHICH IS SUBJECT TO
<br /> RV RELIEF VALVE PROVIDE FLOOR AND WALL CLEANOUTS AS INDICATED ON THE CHANGE AT ANYTIME)AND DO NOT REFLECT
<br /> HR HOUR WATER HEATER 6. ALL PIPING AND/OR PLUMBING DEVICES SHALL BE SUPPORTED FROM ACTUAL SITE CONDITIONS. NEITHER PARTY
<br /> DRAWINGS OR WHERE REQUIRED BY CODE IN ALL SOIL, WASTE, AND
<br /> HVAC HEATING, VENTILATION,AND AIR SIZE WATER HEATER PER STARBUCKS STANDARD AND PER AUTHORITIES DRAIN LINES. SEE SPECIFICATIONS FOR TYPES. CLEANOUTS SHALL BE STRUCTURE(NOT FROM HVAC DUCTS OR OTHER PIPES/CONDUITS). SHALL HAVE ANY OBLIGATION NOR LIABILITY TO
<br /> CONDITIONING HB HOSE BIBB HAVING JURISDICTION (AHJ), WHICHEVER IS MORE STRINGENT. PROVIDE A SAME SIZE AS PIPE EXCEPT THAT CLEANOUTS LARGER THAN 4"WILL THE OTHER(EXCEPT STATED ABOVE)UNTIL A
<br /> HW HOT WATER GLASS-LINED, ENERGY EFFICIENT, GAS FIRED(OR ELECTRIC EQUIVALENT) NOT BE REQUIRED. 7. REFER TO OUTLINE SPECIFICATIONS FOR PLUMBING SPECIFICATION WRITTEN AGREEMENT IS FULLY EXECUTED BY
<br /> HS HANDSINK SHOCK ABSORBER WATER HEATER(SEE SPECIFICATIONS). PROVIDE INSTALLATION COMPLETE SECTIONS BOTH PARTIES.
<br /> HWS HOT WATER SUPPLY WITH FITTINGS AS SHOWN IN THE DRAWINGS. SET HOT WATER INSTALLATION
<br /> HWR HOT WATER RETURN TEMPERATURE AT 140° F OR ADJUST AS REQUIRED BY AHJ. PROVIDE INSTALL PIPING FREE OF SAGS AND BENDS. PROVIDE BRACKET STARBUCKS TEMPLATE VERSION: i2020.10.23
<br /> STRAINER THERMOMETER ON HOT WATER PIPE LEAVING WATER HEATER. STANDOFFS FROM MOUNTING SURFACES SUFFICIENT TO ALLOW 1"
<br /> LL LANDLORD
<br /> LV LOW VOLTAGE WCO WALL CLEANOUT WATER FILTRATION ADDED
<br /> OF CLEANING SPACE ALL AROUND PIPING, INCLUDING ANY GENERAL TE
<br /> ADDED PIPING INSULATION. INSTALL FITTINGS FOR CHANGES IN
<br /> STARBUCKS WATER FILTRATION VENDOR WILL PROVIDE FILTRATION DIRECTION AND BRANCH CONNECTIONS. INSTALL SLEEVES FOR PIPES
<br /> MAX MAXIMUM SYSTEM. PASSING THROUGH CONCRETE AND MASONRY WALLS, GYPSUM BOARD SCOPE
<br /> MC MECHANICAL CONTRACTOR FCO FLOOR CLEANOUT CONTRACTOR SHALL CONFIRM WITH STARBUCKS CONSTRUCTION PARTITIONS, CONCRETE FLOOR AND ROOF SLABS. SEAL PIPE THE INTENT OF THE SPECIFICATIONS AND THE DRAWINGS IS TO
<br /> MDP MAIN DISTRIBUTION PANEL MANAGER PENETRATIONS THROUGH RATED CONSTRUCTION WITH FIRE STOPPING PROVIDE A
<br /> MECH MECHANICAL ® FS FLOOR SINK WHETHER VENDOR OR PLUMBING CONTRACTOR IS TO INSTALL FILTRATION SEALANT MATERIAL PER CODE REQUIREMENTS. DO NOT INSTALL PEX COMPLETE AND FULLY OPERATIONAL PLUMBING SYSTEM. THE
<br /> MEP MECHANICAL, ELECTRICAL,AND PLUMBING SYSTEM. PROVIDE AND COORDINATE INSTALLATION COMPLETE WITH ALL PIPING IN RATED WALLS OR THROUGH RATED FLOORS. INSTALL PER CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT 5858 Wilshire Blvd #200 T: 323.954.8996
<br /> MFG MANUFACTURERPIPING, FITTINGS, AND EQUIPMENT AS INDICATED ON THE DRAWINGS. MANUFACTURER'S INSTRUCTIONS AND ENSURE PROPER PROTECTION RELATED TO THE INSTALLATION OF THE PLUMBING WORK.
<br /> MIN MINIMUM Fm_1 LOS Angeles, CA 90036 F: 323.954.8965 WM WATER METER OF PEX PIPING FROM METAL EDGES. UNDERGROUND WATER AND
<br /> MS MOP SINK CONNECTIONS SEWER LINES SHALL BE LAID IN SEPARATE TRENCHES WITH A MINIMUM SITE EXAMINATION www.valerioinc.com * info@valerioinc.com
<br /> POC CONNECT TO EXISTING THE PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO HORIZONTAL SPACING AS REQUIRED BY CODE, EXCAVATED TO THE THE CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS WHERE
<br /> NL NIGHTLIGHT EQUIPMENT INCLUDING REQUIRED MATERIAL SUCH AS PIPING, VALVES, PROPER DEPTH AND GRADED TO PRODUCE THE REQUIRED FALL. FIXTURES, EQUIPMENT,AND PIPING WILL BE INSTALLED AND WILL
<br /> NTS NOT TO SCALE FILTERS,TRAPS, CHECKS VALVES,VACUUM BREAKERS,AND FLEXIBLE AND REPORT ANY CONDITION THAT, IN HIS OPINION, PREVENTS THE PROPER
<br /> RIGID TUBING. TESTING INSTALLATION OF THE PLUMBING WORK. ;.QROF...... ••.
<br /> PC PLUMBING CONTRACTOR ALL PIPES SHALL BE TESTED BY AN APPROVED METHOD BEFORE THEY ACTES �� N�.R q�
<br /> PS PREP SINK SCHEDULES ARE STANDARDS '�e��P F PyFyc':
<br /> POC POINT OF CONNECTION REFER TO SCHEDULES ON DRAWINGS FOR A DESCRIPTION OF LISTED ITEMS BACKFILLED OR CONCEALED.AFTER TESTING IS COMPLETE,THE EQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATE ENGINEERING z'
<br /> AND FURNISH ANY AND ALL PLUMBING FIXTURES LISTED AS"GC". ANY PLUMBING PROVISIONS OF CSA, ULC,ASME, ASTM, UL, NEMA,ANSI, ASHRAE, NFPA, 400 N McCarthy Blvd. Ep d6/m/71
<br /> REF REFERENCE DISCREPANCIES ABOUT WHO IS TO PROVIDE PLUMBING FIXTURES IN THE CONTRACTOR SHALL DISINFECT THE POTABLE WATER SYSTEM AS AS Suite 250,Milpitas,CA 95035 •?
<br /> REQ'D REQUIRED SCHEDULE SHALL BE BROUGHT TO STARBUCKS ATTENTION FOR REQUIRED BY LOCAL AUTHORITY.TEST WATER PURITY ACCORDING TO APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY. ph:(408)522-5255 •'• HAN%r- ���.�•
<br /> REV REVISION CLARIFICATION. INSTALL ALL FIXTURES LISTED REGARDLESS OF WHO LOCAL REQUIREMENTS AND SUBMIT CERTIFIED TEST RESULTS TO fx:(408)522-5260 ••''•rF OF CpU�FO�':
<br /> SUPPLIES. ENGINEER FOR REVIEW AND APPROVAL. CODES info@a (D2et ••••••
<br /> SHT SHEET Copyright©2021
<br /> ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL
<br /> SF SQUARE FEET HAND SINK IDENTIFICATION APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE
<br /> SPECS SPECIFICATIONS) IF FAUCET HAS A TEMPERATURE LIMIT STOP, IT IS TO BE REMOVED SO THAT PROVIDE PIPE IDENTIFICATION EVERY 10 FT(EXCEPT WHERE PIPES ARE OF
<br /> SST STAINLESS STEEL TEMPERED WATER FROM THE WATER HEATER IS NOT FURTHER REDUCED. EXPOSED TO PUBLIC) IN ACCORDANCE WITH SPECIFICATIONS. CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE
<br /> HOT WATER 1000- 110° F(34°-43°C) MUST BE ABLE TO REACH SINK WITHIN CODES
<br /> TEL TELEPHONE 15 SECONDS. AND ORDINANCES,THE HIGHEST STANDARD SHALL APPLY. THE
<br /> TEMP TEMPORARY CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUM
<br /> TMV TEMPERATURE MIXING VALVE UTILITY SINKS CARBONATION STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS.
<br /> TW TEMPERED HOT WATER UTILITY SINKS ARE TO DELIVER A WATER TEMPERATURE RANGE OF
<br /> TYP TYPICAL 110°- 120° F(43°-49° C). PERMITS AND FEES
<br /> LINO UNLESS NOTED OTHERWISE IF APPLICABLE TO PROJECT SCOPE, STARBUCKS CARBONATION VENDOR THE CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS, FEES,
<br /> DISHWASHER WILL PROVIDE AND INSTALL EQUIPMENT, CO2 TANKS AND FITTINGS. AND
<br /> G.C.TO FURNISH AND INSTALL POWER CORD FOR DISHWASHER PER STARBUCKS SHALL PROVIDE AND CONTRACTOR SHALL INSTALL CO2 INSPECTIONS NECESSARY TO COMPLETE THE PLUMBING WORK.
<br /> V VENT JURISDICTIONAL REQUIREMENTS. IF EQUIPMENT IS SPECIFIED AS TANK MOUNTING BRACKET, PROTECTIVE SHELVING UNIT AND CO2 GAS
<br /> W SANITARY WASTE HOBART ADVANSYS,THE UNIT IS TO BE PLUMBED WITH COLD, NON- TUBING AS SHOWN ON DRAWINGS AND PER MANUFACTURER'S WARRANTY
<br /> WCO WALL CLEANOUT FILTERED WATER. IF THE WATER FILTRATION SYSTEM IS A PENTAIR INSTRUCTIONS. MAXIMUM TUBING LENGTH INCLUDING COILED ENDS IS THE CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL WORK TO Q
<br /> WH WATER HEATER CONFIGURATION II 100 FT(30 M)AND MAXIMUM BEND IS TO 3 INCH (75 MM)MINIMUM RADIUS. BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD LO >>
<br /> WP WEATHER PROOF OR III,THEN THE COLD, NON-FILTERED WATER MUST ALSO BE SOFTENED. ROUTE CO2 TUBING PREFERABLY THROUGH WALL AND/OR CEILING OF ONE (1)YEAR FROM THE DATE OF FINAL ACCEPTANCE BY r z
<br /> CAVITIES, WITHOUT KINKS AND SO AS TO NOT TOUCH ANY HOT SURFACE STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORK
<br /> (BALLAST, STEAM PIPE, ETC.)OR RUB AGAINST A SHARP EDGE THAT MAY PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTING ,A�XX LN
<br /> ABRADE OR CUT TUBING. ALL HOLES MUST BE SEALED WITH A WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS W Q 85 O
<br /> INSULATION GROMMET OR ESCUTCHEON. TUBING IS TO BE SECURED TO AND WORKMANSHIP.
<br /> APPROPRIATE PERMANENT SURFACES TO KEEP IT OFF THE FLOOR OR LEED W >- Q U
<br /> CABINET BOTTOMS AND AWAY FROM OTHER EQUIPMENT. LABEL BOTH J U) U Z
<br /> WATER PIPING ENDS OF TUBING AND REGULARLY AT TEN (10) FOOT INTERVALS ALONG ALL WORK, MATERIALS AND EQUIPMENT SHALL MEET LEED W
<br /> PROVIDE THERMAL INSULATION PER THE SPECIFICATIONS. UNLESS ROUTE AS"CO2." REQUIREMENTS&CODE. IN CASE OF CONFLICT,THE HIGHER C — z
<br /> OTHERWISE REQUIRED BY THE LOCAL AUTHORITY OR ENERGY CODES, THE STANDARD SHALL APPLY. G 0 Z O 0
<br /> MINIMUM INSULATION LEVELS SHALL BE AS FOLLOWS: Z pQ Q
<br /> PIPE SIZE(DIAMETER) INSULATION THICKNESS N I T ROG E NATION U = U CV V O
<br /> LESS THAN OR EQUAL TO 1 1/2"(38MM) = 1"(24MM) LANDLORD REQUIREMENTS w CD W C O z
<br /> STARBUCKS NITROGENATION VENDOR WILL PROVIDE AND INSTALL 0
<br /> O
<br /> 2"(51 MM)OR GREATER = 1 1/2"(38MM) EQUIPMENT AND FITTINGS IF APPLICABLE TO PROJECT SCOPE FOR PRIOR TO BID: THE CONTRACTOR SHALL COORDINATE WITH LANDLORD/ a W a
<br /> NITRO STATION. GENERAL CONTRACTOR SHALL COORDINATE NITRO BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS/
<br /> (INSULATION VALUE = K VALUE NOT EXCEEDING 0.27 BTU" INCH (H"FT2"F) SYSTEM INSTALLATION WITH STARBUCKS VENDOR. SPECIFICATIONS. IF LANDLORD/BUILDING OWNER DOES HAVE
<br /> REQUIREMENTS, CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR STORE #: 9287
<br /> SAFETY COVERS WITH REQUIREMENTS/SPECIFICATIONS AND ADHERE TO THEM. WHERE PROJECT #: 23544-077
<br /> FURNISH AND INSTALL SPECIFIED NO SCALD SAFETY COVERS WITH LANDLORD/BUILDING OWNER REQUIREMENTS ARE MORE STRINGENT
<br /> INSULATED FOAM LINER AND TAMPER PROOF STRAP AT ALL EXPOSED ADA THAN SHOWN IN THESE PLANS(IN THE OPINION OF THE ENGINEER). ISSUE DATE: 03/12/2021
<br /> SINK P-TRAPS AND WATER SUPPLIES AND AS REQUIRED BY JURISDICTION . LANDLORD/BUILDING OWNER REQUIREMENTS SHALL GOVERN.
<br /> SR. DESIGN MANAGER: JESSICA RAMOS
<br /> DESIGN MANAGER:
<br /> CHECKED BY:
<br /> Revision Schedule
<br /> Rev Date By Description
<br /> 03/12/21 ACIES PERMIT SET
<br /> SHEET TITLE:
<br /> PLUMBING SYMBOLS
<br /> LIST & ABBREVIATIONS
<br /> SCALE: N.T.S.
<br /> SHEET NUMBER:
<br /> P-0001
<br />
|