Laserfiche WebLink
GEOSYNTEC CONSULTANTS <br /> Ms. Amy Terrell <br /> 25 August 2003 <br /> Page 8 <br /> analyzed by analytical methods similar to those of the United States Environmental <br /> Protection Agency(USEPA). <br /> Table 2: Analytical Schedule for WFS Vernalis Microcosm Evaluation <br /> Pre-treatment Treated Microcosms <br /> Analyses to be conducted homogenized soil To Ti TZ <br /> Nitrogen species (NH4-N, <br /> X X X X <br /> NO3-N and NZ-N) <br /> pH X X X <br /> Nitrogen gas(and other <br /> dissolved headspace gases) X <br /> Carbon(total, inorganic <br /> X X <br /> and organic) <br /> Amendment Consumption X X X <br /> Task 4—Reporting <br /> SiREM will tabulate and interpret the study data and prepare a summary report <br /> containing the methodology and all data generated from the microcosm studies, as well <br /> as the major conclusions derived for the study. GeoSyntec will review the report and <br /> incorporate the information into a report for submittal to the RWQCB. <br /> SCHEDULE <br /> Following RWQCB approval of this Work Plan, and WFS authorization, <br /> GeoSyntec will proceed with implementing the microcosm-testing program. After the <br /> soil samples are collected, the testing program may take from 1 to 3 months to <br /> complete, depending upon observed results. GeoSyntec will provide updates on the <br /> P:\PRJ2003REM\WFS\VER\Soil Plan 2003\RAP-Soil 8-25.doc <br /> A AMs <br /> FwvrxE AmwaraeeiE AILMAL <br />