Laserfiche WebLink
Raney Geotechnical,Inc. Project: CABRAL PROPERTY <br /> 3140 Beacon Blvd Project Number: [none] Reported: <br /> West Sacramento CA,95691 Project Manager: Peter Ruttan 04/10/06 17:25 <br /> Notes and Definitions <br /> QM-03 Multiple analyses indicate the percent recovery exceeds the Quality Control acceptance criteria due to a matrix effect. <br /> DET Analyte DETECTED <br /> ND Analyte NOT DETECTED at or above the reporting limit <br /> NR Not Reported <br /> dry Sample results reported on a dry weight basis <br /> RPD Relative Percent Difference <br /> SunStar Laboratories,Inc. The results in this report apply to the samples analyzed in accordance with the chain of <br /> //— custody document. This analytical report must be reproduced in its entirety. <br /> John Shepler,Laboratory Director Page 7 of 7 <br />