Laserfiche WebLink
Raney Geotechnical,Inc. Project: CABRAL PROPERTY <br /> 3140 Beacon Blvd Project Number: [none] Reported: <br /> West Sacramento CA,95691 Project Manager: Peter Ruttan 04,27/06 16:78 <br /> ANALYTICAL REPORT FOR SAMPLES <br /> Sample ID Laboratory ID Matrix Date Sampled Date Received <br /> WS-1A,WS-1B T501232-30 Soil 10/14/05 00:00 10/18/05 10:00 <br /> WS-2 T501232-31 Soil 10/14/05 00:00 10/18/05 10:00 <br /> 4204-GAR-1 T501232-32 Soil 10/14/05 00:00 10/18/05 10:00 <br /> WSG-IA,WSG-IB,WSG-IC T501232-33 Soil 10/14/05 00:00 10/18/05 10:00 <br /> WSG-2A,WSG-2B T501232-34 Soil 10/14/05 00:00 10/18/05 10:00 <br /> SunStar Laboratories,Inc. The results in this report apply to the samples analyzed in accordance with the chain of <br /> custody document.This analytical report must be reproduced in its entirely. <br /> Ben Beauchaine For John Shepler,Laboratory Director Page 2 of 43 <br />