My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2947
>
2200 - Hazardous Waste Program
>
PR0505986
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 10:55:45 AM
Creation date
6/26/2020 10:06:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505986
PE
2247
FACILITY_ID
FA0005785
FACILITY_NAME
SFPP LP (STOCKTON TERMINAL)
STREET_NUMBER
2947
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503010
CURRENT_STATUS
01
SITE_LOCATION
2947 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Impact of Major Spills on SPCC Regulations ood for thought... <br /> Exxon Valdez, 1989: <br /> — 11 million gallons of crude oil spilled into Prince William Sound, A spill of only one gallon Of Oil can <br /> Alaska <br /> — Damaged ecosystems and impacted fishing industry contaminate a mi//ion gallons of water <br /> — led to oil Pollution Act of 1990 which expanded prevention, osts associated with spill prevention are <br /> preparedness and response activities,required FRPs(Section 8 <br /> of the KM Integrated Contingency Plan) ually much less than the cost Of Spill <br /> _ cleanup, fines, other civil liabilities <br /> Kinder Morgan ai SPCC Plan Purpose/Objectives ` <br /> SPCC Plan Format <br /> tions in SPCC Plans: <br /> The Plan objectives are to define the spill prevention, <br /> —Introduction&General Information control,and countermeasures for the Facility and to assist <br /> Notification&Response Procedures sonnet with maintaining efficient and effective program. <br /> —Training&Inspection Programs a Plan components to meet the objectives are: <br /> Facility Drainage Spill prevention equipment listings and procedures <br /> 5—Bulk Storage Containers Required inspections&records <br /> - -Facility drainage <br /> 6—Transfers,Pumping,&In-Plant Process Operations —Security <br /> 7—Tank Car and Truck Loading/Unloading —Training <br /> • 8—Security - <br /> 15 16 <br /> SPCC Plan Review & Amendments <br /> aoP� <br /> men men equirements <br /> A Plan must be revised when changes in design, '�� I <br /> construction operation,or maintenance affect <br /> the potential for discharge of oil to waters of the <br /> US. <br /> Revisions must be: n �� <br /> — Prepared(put into Plan)within 6 months of a vin• 4':_ � <br /> change in one of the above. CC <br /> —Implemented ASAP,but no later than 6 months <br /> after Plan revision prepared. <br /> — Reviewed by Plan holders and logged on the <br /> designated document in the Plan. <br /> Five-year management review <br /> 17 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.