Laserfiche WebLink
Monthly Inspection — L-0&M Form <br /> Inspections (cont.) 2100-02 <br /> Check for leaks and <br /> Check for shell distortions <br /> Check for signs ofsettlement <br /> Check for corrosion <br /> Check condition of foundation <br /> Check paint coatings <br /> Check insulation system,if applicable <br /> -- Check appurtenances <br /> Handgaugetanks <br /> • Compare side gauge to tank monitoring system <br /> • Check leak detection,d applicable <br /> • Check redundant high level alarm®®®� <br /> • Check tank pads for erosion <br /> • For DOT Tanks,inspector must be OQ d <br /> • Maintain Record of Inspection for possible DOTlnspection <br /> 2s <br /> Inspections (cont. Inspections (cont.) <br /> ment Inspections — Containers ment Inspections and Tests <br /> Urns) boveground Piping,Valves, etc. "1 <br /> —certified by manufacturers as meeting US •visually checked during daily rounds C <br /> DOT specifications and standards L <br /> _ —visually inspected at least monthly by facility — —Buried Piping <br /> personnel •integrity and leak tested at installation, <br /> —kept from ground contact as much as possible modification,relocation,or replacement <br /> •cathodically-protected with annual inspection by <br /> —Labels(for identification &hazards) intact and corrosion specialist <br /> in good condition <br /> 27 28 <br /> Inspections (cont.) _� Facility Drainage <br /> ment Inspections and Tests— —Drainage is controlled by manually-controlled valves <br /> which are locked in closed position unless draining <br /> umentation storm water from diked areas. <br /> —Inspection and test records are maintained on —Accumulated storm water that does not dissipate <br /> file at least 3 years. naturally is removed in accordance with the <br /> stormwater drainage procedures(Section 4.3 in <br /> —All training and quarterly safety&annual Plan). <br /> abnormal operations meetings are to be Undiked Process Areas <br /> documented and maintained-on site. —Drainage is controlled by curbing or other means to <br /> Document SPCC topics discussed.Thetypical contain potentially contaminated storm water onsite. <br /> required duration is 5 years plus current year. Contained storm water is conveyed to the facility <br /> waste water management system,naturally <br /> dissipated,or otherwise properly managed. <br /> 29 30 <br />