Laserfiche WebLink
Monthly Inspection — L-O&M Form <br /> Inspections (cont.) 2100-02 <br /> • Check for leaks and stains KIKRER�YORORN <br /> • Check for shell distortions <br /> • Check for signs of settlement ✓., 5 <br /> • Check for corrosion <br /> • Check condition of foundation \�\y <br /> • Check paint coatings f <br /> • Check insulation system,if applicable <br /> • Check appurtenances <br /> • Hand gauge tanks <br /> • Compare side gauge to tank monitoring system „____ ___-_ - <br /> _ _ ____ __ <br /> • Check leak detection,if applicable <br /> • Check redundant high level alarm <br /> • Check tank pads for erosion W: r <br /> • For DOT Tanks,inspector must be OQ d ”w. """ . i <br /> • Maintain Record of Inspection for possible DOT Inspection <br /> 25 <br /> 25 26 <br /> Inspections (cont.) Inspections (cont.) <br /> • Equipment Inspections—Containers • Equipment Inspections and Tests <br /> Drums —Aboveground Piping,Valves,etc. <br /> —certified b manufacturers as meeting US •visually checked during daily rounds <br /> DOT specifications and standards <br /> —visually inspected at least monthly by facility —Buried Piping <br /> personnel •integrity and leak tested at installation, <br /> -kept from ground contact as much as possible modification,relocation,or replacement <br /> •cathodically-protected with annual inspection by <br /> —Labels(for identification&hazards) intact and corrosion specialist <br /> in good condition <br /> 2] 28 <br /> 27 28 <br /> Inspections (cont.) Facility Drainage <br /> • Diked Storage Areas <br /> • Equipment Inspections and Tests- -Drainage is controlled by manually-controlled valves <br /> which are locked in closed position unless draining <br /> Documentation storm water from diked areas. <br /> -Inspection and test records are maintained on -Accumulated storm water that does not dissipate <br /> file at least 3 years. naturally is removed in accordance with the <br /> stormwater drainage procedures(Section 4.3 in <br /> —All training and quarterly safety&annual Pan). <br /> abnormal operations meetings are to be • Undiked Process Areas <br /> documented and maintained on site. -Drainage is controlled by curbing or other means to <br /> Document SPCC topics discussed.The typical contain potentially contaminated storm water onsite. <br /> required duration is 5 years plus current year. contained storm water is conveyed to the facility <br /> waste water management system,naturally <br /> dissipated,or otherwise properly managed. <br /> 2s 30 <br /> 29 30 <br /> 5 <br />