My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2947
>
2200 - Hazardous Waste Program
>
PR0505986
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 10:55:45 AM
Creation date
6/26/2020 10:06:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505986
PE
2247
FACILITY_ID
FA0005785
FACILITY_NAME
SFPP LP (STOCKTON TERMINAL)
STREET_NUMBER
2947
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503010
CURRENT_STATUS
01
SITE_LOCATION
2947 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tormwater Discharge Observation Form <br /> 61 62 <br /> 7Sampfing: <br /> le n me-n _pent I <br /> cont.) <br /> •Sampling(cont.): <br /> storm event -one producing discharge from •Required sampling parameters include pH(field <br /> at least one drainage area,and preceded by 48 hours measurement),Oil&Grease,TSS,any pollutant on <br /> with no discharge from any area 303(d)list for receiving water body that could <br /> •Four QSEs must be sampled;two during first half of potentially be discharged,and any other pollutant of <br /> reporting year(Jul 1-Dec 31),and two during second half concern determined by discharger <br /> (Jan i-Jun 30);best to sample first two discharges during •Samples must be collected within the first four hours of <br /> each period to avoid missed opportunities the start of discharge,or within four hours of facility <br /> •After four successful sampling events with no opening and within 12 hours of discharge <br /> exceedances or other permit non-compliance events, •Monitoring Implementation Plan must be incorporated <br /> facility qualifies for sampling reduction to two events into SWPPP <br /> per year(one in each half of year);requires SWPPP <br /> update. <br /> 63 64 <br /> 63 64 <br /> n er Cu <br /> 7Numeric <br /> L ------ - - (cont.) --- - - <br /> ction Levels(NALs): •Exceedance Response Actions: <br /> f required sampling will be compared to two •If facility exceeds an annual or instantaneous NAL, <br /> types of NALs: status changes from Baseline to Level i <br /> •Annual NAL exceedance occurs when the average of •If facility exceeds an annual or instantaneous NAL for <br /> all analytical results for all samples collected during a the same parameter while in Level 1,status changes to <br /> reporting year for a given parameter exceeds annual Level a <br /> NAL value •Each level requires escalated response actions,including <br /> BMP evaluations,action plans,and technical reports <br /> • Instantaneous NAL exceedance occurs if two or more prepared by a Qualified Industrial Storm Water <br /> analytical results from samples taken for any Practitioner(QISP) <br /> parameter during a reporting year exceed •Dischargers that enter Level i status must ensure a QISP <br /> instantaneous NAL values provides adequate training to appropriate team <br /> members <br /> 65 66 <br /> 65 66 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.