Laserfiche WebLink
1.0 Introduction Version :27.10.4 <br /> FIGURE 1.1 <br /> FACILITY INFORMATION (Cont'd) <br /> PHYSICAL DESCRIPTION - TRUCK TRANSFER <br /> Truck Rack <br /> Description of Operation: <br /> The Facility is equipped with two (2) loading bay spots, which handle various grades of gasoline and <br /> diesel. Two (2) trucks can be loaded at a time. The loading/unloading operations are conducted on <br /> a 24 hour/7 day per week basis. <br /> Loading Rate: 600 GPM (typical) <br /> Largest Truck Capacity: 9,000 Gallons (typical) <br /> Transfer Loading Volume: 9,000 Gallons <br /> Discharge Prevention: The curbed concrete slab drains directly to slop tank #UG1. From there, <br /> drainage is transferred to slop tank #12 and then removed by truck. Overfill shutdown protection <br /> prevents spillage. Safe operating procedures are posted. <br /> Methods/Equipment to prevent premature vehicle departure: <br /> . Truck Interlock System <br /> Shell Supply and Distribution 1-13 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date: October, 2019 <br />