Laserfiche WebLink
A. Response Resources Version :27.10.4 <br /> FIGURE A.1 <br /> EMERGENCY RESPONSE EQUIPMENT <br /> Date of Last Update: Last Inspection or Response <br /> Equipment Test Date: <br /> Inspected By: Last Deployment Drill Date: <br /> Inspection Frequency: Deployment Frequency: <br /> Fire/Rescue Equipment: <br /> Fire Fighting and Rescue Equipment <br /> /Shelf Life Operational Quantity Location(s) <br /> Status <br /> 20 lbs. ABC/2004/Note 1 Ready 1 Office <br /> 5 lbs. BC/2016/Note 1 Ready 1 Break Room <br /> 5 lbs. ABC/2007/Note 1 Ready 1 Warehouse <br /> 20 lbs. ABC/2015/Note 1 Ready 1 Forklift <br /> 10 lbs. ABC/2012/Note 1 Ready 1 Foam Shed <br /> 40 lbs. ABC/2007/Note 1 Ready 1 Lanell <br /> 40 lbs. ABC/2007/Note 1 Ready 1 Lane 2 <br /> 40 lbs. ABC/2006/Note 1 Ready 1 Lane 3 <br /> 40 lbs. ABC/2006/Note 1 Ready 1 Pipe Bridge <br /> 40 lbs. ABC/2006/Note 1 Ready 1 L&B Shop <br /> 40 lbs. ABC/2004/Note 1 Ready 1 VRU <br /> 40 lbs. ABC/1997/Note 1 Ready 1 Elect. Cab. <br /> 40 lbs. ABC/2008/Note 1 Ready 1 Ethanol Pumps <br /> 40 lbs. ABC/1981/Note 1 Ready 1 Regular Pumps <br /> 40 lbs. ABC/2007/Note 1 Ready 1 Manifold <br /> 40 lbs. ABC/2006/Note 1 Ready 12 1 Spare/Warehouse <br /> Shell Supply and Distribution A-6 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date: October, 2019 <br />