Laserfiche WebLink
A.Response Resources Version :27.10.4 <br /> FIGURE A.2 <br /> FACILITY RESPONSE EQUIPMENT <br /> Date of Last Update: Last Inspection or Response <br /> Equipment Test Date: <br /> Inspected By: Last Deployment Drill Date: <br /> Inspection Frequency: Deployment Frequency: <br /> Hazardous Material/Oil Spill Equipment: <br /> Type/Model/ Operational Quantity Capacity Effective Storage Date Fuel <br /> Year/Shelf Status GPM Daily Location(s) Last <br /> Life Recovery Changed <br /> Capacity <br /> None <br /> Shell Supply and Distribution A-8 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />