Laserfiche WebLink
Regulatory Cross Reference Version :27.10.4 <br /> PCFRR 40 CFR 112 BRIEF DESCRIPTION LOCATION IN <br /> Appendix F PLAN <br /> 1.5 Discharge Scenarios ----- <br /> (5)(ii) 1.5.1 Small and Medium Discharges App. B <br /> (5)(iii) 1.5.2 Small and Medium Discharges App. B <br /> (5)(i) 1.5.3 Worst Case Discharge App. B <br /> (6) 1.6 Discharge Detection Systems ----- <br /> 1.6.1 Discharge Detection by Personnel App. C.2 <br /> 1.6.2 Automated Discharge Detection App. C.2 <br /> (7) 1.7 Plan Implementation ----- <br /> (7)(i) 1.7.1 Response actions to be carried out by facility 3.1, 3.3, App. A, <br /> personnel or contracted personnel, Response App. B, App. E <br /> Resources for Small, Medium, and Worst Case <br /> Spills <br /> (7)(iii) 1.7.2 Disposal Plans App. F <br /> (7)(iv) 1.7.3 Containment and Drainage Planning C.1, C.5 <br /> (8) 1.8 Self-Inspection, Drills/Exercises, and Response ----- <br /> Training <br /> (8)(i) 1.8.1 Facility Self-Inspection App. C, App. H <br /> (8)(i) 1.8.1.1 Tank Inspection/Secondary Containment App. C, App. H <br /> (8)(i) 1.8.1.2 Response Equipment Inspection App. A, App. H <br /> (8)(ii) 1.8.2 Facility Drills/Exercises App. E, App. H <br /> (8)(iv) 1.8.2.1 Qualified Individual Notification Drill Log App. H <br /> (8)(iv) 1.8.2.2 Spill Management Team Tabletop Exercise Log App. H <br /> (8)(iii) 1.8.3 Response Training App. E, App. H <br /> (8)(iv) 1.8.3.1 Personnel Response Training Log App. H <br /> (8)(iv) 1.8.3.2 Discharge Prevention Meeting Log App. H <br /> (9) 1.9 Diagrams ----- <br /> (1) Site Plan Diagram App. C, Fig. 1.3 <br /> (2) Site Drainage Plan Diagram 1.0, C.5 <br /> (3) Site Evacuation Plan Diagram App. D <br /> (10) 1.10 Security App. C <br /> (11) 2.0 Response Plan Cover Sheet Foreword, Fig. <br /> A.5 <br /> ----- 3.0 Acronyms Glossary and <br /> Acronyms Tab <br /> Shell Supply and Distribution Cross Ref-4 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />