Laserfiche WebLink
Regulatory Cross Reference Version :27.10.4 <br /> EIE2 <br /> BRIEF DESCRIPTION LOCATION IN <br /> PLAN <br /> 817.02(c)(2) Off-Site Consequence Analysis ----- <br /> 817.02(c)(2)(A) Spill trajectories App. G <br /> 817.02(c)(2)(B) Toxicity of spills App. G <br /> 817.02(c)(3) Resources at Risk from Oil Spills § 6.0 <br /> 817.02(c)(3)(A) Map of environmentally sensitive sites Fig. 6.2 <br /> 817.02(c)(3)(B) Economically and culturally sensitive sites Fig. 6.2 <br /> 817.02(c)(4) Required prevention measures App. C <br /> 817.02(c)(4)(A) Testing, maintenance, and inspection procedures App. C <br /> 817.02(c)(4)(B) Methods to reduce spills App. C <br /> 817.02(c)(4)(C) Communication during transfer operations App. C <br /> 817.02(c)(4)(D) Protection measures for flood prone areas App. C <br /> 817.02(c)(4)(E) the plan holder shall provide additional relevant information to the ----- <br /> Administrator upon request <br /> 817.02(d) Containment Booming and On-Water Recovery App. A <br /> 817.02(d)(1) Reasonable Worst Case Spills ----- <br /> 817.02(d)(1)(A) For marine facilities (except on-shore pipelines not subject to N/A <br /> Chapter 6.67 (commencing with Section 25270) or Chapter 6.7 <br /> (commencing with Section 25280)of Division 20, Health and Safety <br /> Code)which are addressed in Subsection (B), offshore platforms <br /> which are addressed in Subsections (C)and (D), and offshore <br /> pipelines which are addressed in Subsection (E) <br /> 817.02(d)(1)(B) For on-shore pipelines not subject to Chapter 6.67 (commencing App. G <br /> with Section 25270)or Chapter 6.7 (commencing with Section <br /> 25280) of Division 20, Health and Safety Code, the largest volume in <br /> barrels <br /> 817.02(d)(1)(C)(1)- For offshore platforms (except those drilling a new well which are N/A <br /> (4) addressed in Subsection (D)): <br /> 817.02(d)(1)(D) For offshore platforms with active well drilling: N/A <br /> 817.02(d)(1)(E) For offshore pipelines, the largest volume in barrels of the following N/A <br /> calculation: <br /> 817.02(d)(1)(F) The calculations, and such parameters as flow rates, line fill App. G <br /> capacities and emergency shutoff times, that are used to determine <br /> a marine facility's reasonable worst case spill shall be submitted as <br /> part of the plan. The Administrator may review and test these <br /> parameters as part of the drill conducted in accordance with <br /> Subsection 816.03(b). <br /> 817.02(d)(2) Persistence and emulsification factors- Response Planning ----- <br /> Volumes <br /> 817.02(d)(2)(A) The reasonable worst case spill volume is then multiplied by a App. G <br /> persistence factor relative to the most persistent type of oil that <br /> may be spilled by the marine facility. The persistence factors <br /> relative to the type of oil spilled, are specified below: <br /> Shell Supply and Distribution Cross Ref-17 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />