Laserfiche WebLink
Regulatory Cross Reference Version :27.10.4 <br /> CALIFORNIA •DOF • <br /> DIVISIONTITLE 14 • • • • <br /> BRIEF DESCRIPTION LOCATION IN <br /> PLAN <br /> 820.01 Drills and Exercises ----- <br /> 820.01(a) Drills and Exercises shall be designed to exercise either portions of App. D <br /> the contingency plans or the entire plan. <br /> 820.01(a)(1) For marine facilities: ----- <br /> 820.01(a)(1)(A) 1. A tabletop exercise, announced or unannounced, of the SMT(s). App. D <br /> 2. Any number of objectives may be tested during the required <br /> exercises. <br /> 3. Over a 3 year period, all objectives as described in Subsection <br /> (e) are to be tested to comply with this section. <br /> 4. For those objectives not successfully tested, the Administrator <br /> may require an additional exercise within 6 months of the <br /> drill/exercise's completion. <br /> 820.01(a)(1)(B) Notification procedures shall be exercised quarterly for the QI, App. D <br /> marine facility personnel, the OSRO and the SMT. <br /> 820.01(a)(1)(C) Semi-annual equipment deployment drills shall be conducted to App. D <br /> test the deployment of facility-owned equipment. <br /> 820.01(a)(1)(D) Shoreline protection strategies shall be exercised as described in App. I <br /> Subsection 820.01(b) below. <br /> 820.01(a)(1)(E) An OSRO field equipment deployment drill for on-water recovery App. I <br /> shall each be conducted at least once every three years. <br /> 820.01(a)(1)(F) Plan Holder shall maintain adequate records of drills and exercises, App. D <br /> for a period of three years, to include records of any drills and <br /> exercises of the facility and resources identified in the contingency <br /> plan. <br /> 820.01(a)(1)(G) All other local, state, and federal laws, regulations and permitting App. D <br /> requirements must be complied with as part of the drill planning and <br /> implementation. <br /> 820.01(b) Shoreline Protection Strategies for Sensitive Sites ----- <br /> 820.01(b)(1) Marine facility Plan Holders are required to drill shoreline protection App. I <br /> response strategies for the ACP-listed sensitive sites within the <br /> area identified in their Contingency Plan as impacted. <br /> 820.01(b)(2) Vessel Plan Holders... N/A <br /> 820.01(b)(3) Plan Holders are required to demonstrate to the Administrator that App. I <br /> these areas have been drilled, either with Plan Holder-owned <br /> equipment or through an OSRO Rated for Shoreline Protection <br /> services under contract with the Plan Holder. <br /> 820.01(c) The Administrator, in addition to the requirements contained in this App. I <br /> Section, may call a drill or exercise, or conduct an inspection, to <br /> validate all or part of a contingency plan. <br /> 820.01(d) To receive credit from the Office of Spill Prevention and Response App. G <br /> (OSPR)for an exercise, the following requirements must be met: <br /> 820.01(d)(1) The Plan Holder shall invite the Administrator to participate in both App. I <br /> the equipment deployment drills and the Spill Management Team <br /> tabletop exercises by submitting written notice to the Administrator. <br /> Shell Supply and Distribution Cross Ref-23 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />