Laserfiche WebLink
Regulatory Cross Reference Version :27.10.4 <br /> CALIFORNIA •DOF • <br /> 22 CCR§66264.52 and §66264.53 <br /> A Large Quantity Generator(LQG) must comply with the requirements of 22 CCR §66264.52 and <br /> §66264.53. Specifically, this part, titled "Contingency Plan and Emergency Procedures", requires <br /> that generators have a written contingency plan to minimize hazards to human health or the <br /> environment from fires, explosions, or any unplanned sudden or non-sudden releases of hazardous <br /> waste or hazardous waste constituents to air, soil, or surface water. The provisions of the Plan <br /> must be carried out immediately whenever there is a fire, explosion, or release of hazardous waste <br /> or hazardous waste constituents that could threaten human health or the environment. <br /> * Regulatory Regulatory Requirerne IL Location in Plan <br /> Citation <br /> 22 CCR A description of the actions that Facility personnel must take Section 3.0 (all) <br /> §66264.52(a) to respond to hazards to human health or the environment <br /> from fires, explosions, or any unplanned sudden or non- <br /> sudden release of hazardous waste or hazardous waste <br /> constituents to the air, soil, or surface water. <br /> 22 CCR If the owner or operator has already prepared a Spill Regulatory Cross <br /> §66264.52(b) Prevention, Control, and Countermeasure (SPCC) Plan in Reference <br /> accordance with Title 40 CFR Part 112, or Part 1510, or <br /> some other emergency or contingency plan, the owner or <br /> operator need only amend that plan to incorporate <br /> hazardous waste management provisions that are sufficient <br /> to comply with the requirements of this chapter. <br /> 22 CCR Arrangements agreed to by local police departments, fire Foreword - <br /> §66264.52(c) departments, hospitals, contractors, and State and local Distribution List <br /> emergency response teams to coordinate emergency <br /> services and to indicate whether State or local authorities (Arrangements <br /> decline to enter into such arrangements. Pending) <br /> 22 CCR A listing of names, addresses, and phone numbers (office Section 1.0 - <br /> §66264.52(d) and home) of all persons qualified to act as an emergency Figure 1.1, <br /> coordinator. The list must be kept up to date. Section 2.0 - <br /> Figure 2.1 <br /> 22 CCR A list of all emergency equipment at the Facility (such as fire Appendix A, <br /> §66264.52(e) extinguishing systems, spill control equipment, Appendix D, <br /> communications and alarm systems and decontamination Evacuation <br /> equipment)where this equipment is required. The list must Diagram <br /> be kept up to date. The Contingency Plan must include the <br /> location and a physical description of each item on the list, <br /> and a brief outline of its capabilities. <br /> 22 CCR An evacuation plan for Facility personnel where there is a Appendix D (all) <br /> §66264.52(f) possibility that evacuation could be necessary. The Plan <br /> must include signals to be used to begin evacuation, <br /> evacuation routes, and alternate evacuation routes. <br /> 22 CCR The plan shall include the current telephone number of the Section 2.0 - <br /> §66264.52(g) State Office of Emergency Services. Figure 2.5 <br /> Shell Supply and Distribution Cross Ref-38 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />