My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
PR0009229
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 9:39:55 AM
Creation date
6/26/2020 5:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009229
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0004047
FACILITY_NAME
STOCKTON ARMY AVIATION SUPPORT FACILITY / PFAS SITE INSPECTION
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726004 AND 17726034
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2000 STIMSON ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wash/rinse chemical resistant outer glove, then remove as appropriate <br />remove and throw out inner disposable nitrile liner gloves in designated, lined <br />receptacles <br />Level C: Segregated Equipment Drop <br />- wash/rinse outer boots <br />- washh-inse chemical resistant outer gloves, then remove tape and gloves <br />- remove chemical resistant suit (remove by rolling down suit from the inside) <br />- remove outer boots <br />- remove first pair(s) of disposable gloves <br />- remove respirator, hard hat/faceshield and properly dispose of cartridges; wash <br />respirator <br />- remove last pair of disposable nitrile liner gloves <br />Level B: Segregated Equipment Drop <br />- wash/rinse outer boots <br />- wash/rinse chemical resistant outer gloves <br />- cross hotline (into clean area) and change air tanks, then redress or <br />- cross hotline (into clean area) <br />- remove boots and gloves <br />- remove SCBA, if worn over chemical resistant suit <br />- if SCBA is worn under the suit, remove the chemical resistant suit, then the <br />SCBA <br />- remove hard hat <br />- remove disposable nitrile liner gloves <br />5.6 DRILLING PROCEDURES <br />A digsafe number must be obtained from the appropriate agency prior to drilling, excavation or <br />trenching. To determine presence of subsurface metal utility lines, tanks and/or drums (if <br />suspected), a metal detector should be used before excavating on a Site. <br />During the operation, two persons (one designated as "operator" and the other as the "helper") <br />must be present at all times. The helper (whether Versar personnel or subcontractors) must be <br />instructed as to the whereabouts of the emergency shut-off switch. Every attempt must be made <br />to keep unauthorized personnel from entering the work area. If this is not possible, the operation <br />should be shut down until the area is cleared. The Site Safety Officer or the Field Team Leader <br />has the authority and responsibility to shut down the excavating operations whenever a hazardous <br />situation is deemed present. <br />The arm of any equipment should maintain a preferred clearance of 20 feet fiom any overhead <br />electrical cables, with 10 feet being the minimum. All operations will immediately cease during <br />3025-03/114700.4766.023/NL23'03 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.