My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
PR0009229
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 9:39:55 AM
Creation date
6/26/2020 5:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009229
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0004047
FACILITY_NAME
STOCKTON ARMY AVIATION SUPPORT FACILITY / PFAS SITE INSPECTION
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726004 AND 17726034
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2000 STIMSON ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Inspection UFP-QAPP Addendum <br />Stockton AASF, Stockton, California <br />Table of Contents <br />1. Introduction <br />1.1 Project Authorization <br />1.2 SI Purpose <br />1.3 QAPP Addendum Organization <br />QAPP Worksheets #1 & #2: Title and Approval Page and QAPP Identifying Information <br />QAPP Worksheets #3 & #5: Project Organization and QAPP Distribution <br />QAPP Worksheets #4, #7 & #8: Personnel Qualifications and Sign -off Sheet <br />QAPP Worksheet #6: Communication Pathways <br />QAPP Worksheet #9: Technical Project Planning Session Summary <br />QAPP Worksheet #10: Conceptual Site Model <br />QAPP Worksheet #11: Project/Data Quality Objectives <br />Final PQAPP Worksheet #12: Measurement Performance Criteria <br />Final PQAPP Worksheet #13: Secondary Data Uses and Limitations <br />QAPP Worksheet #14 & #16: Project Tasks and Schedule <br />Final PQAPP Worksheet #15: Screening Limits and Laboratory -Specific Detection/ <br />Quantitation Limits <br />QAPP Worksheet #17: Sampling Design and Rationale <br />QAPP Worksheet #18: Sampling Locations and Methods <br />Final PQAPP Worksheet #19 & #30: Sample Containers, Preservation, and Hold Times <br />Final PQAPP Worksheet #20: Field Quality Control Summary <br />Final PQAPP Worksheet #21: Field Standard Operating Procedures <br />Final PQAPP Worksheet #22: Field Equipment Calibration, Maintenance, Testing, and <br />Inspection <br />Final PQAPP Worksheet #23: Analytical Standard Operating Procedures <br />Final PQAPP Worksheet #24: Analytical Instrument Calibrations <br />Final PQAPP Worksheet #25: Analytical Instrument and Equipment Maintenance, Testing <br />and Inspection <br />Final PQAPP Worksheet #26 & #27: Sample Handling, Custody, and Disposal <br />Final PQAPP Worksheet #28: Analytical Quality Control and Corrective Actions <br />Final PQAPP Worksheet #29: Project Documents and Records <br />Final PQAPP Worksheet #31, #32 & #33: Assessments and Corrective Action <br />Final PQAPP Worksheet #34: Data Verification and Validation Inputs <br />Final PQAPP Worksheet #35: Data Verification Procedure <br />Final PQAPP Worksheet #36: Data Validation Procedures <br />Final PQAPP Worksheet #37: Data Usability Assessment <br />2. References <br />AECOM <br />
The URL can be used to link to this page
Your browser does not support the video tag.