Laserfiche WebLink
Site Inspection UFP-QAPP Addendum <br />Stockton AASF, Stockton, California <br />5) Collect data to determine whether the release is more than likely the result of activities <br />associated with the Department of Defense (DoD). <br />In addition to the USEPA identified goals of an SI, the ARNG SI effort will also aim to evaluate <br />whether the concentrations can be attributed to on -facility or off -facility sources that were <br />identified within 4 miles of the facility as part of the PA (e.g., fire stations, major manufacturers, <br />other DoD facilities). <br />1.3 QAPP Addendum Organization <br />Elements of every ARNG PFAS SI are addressed in the SI Programmatic UFP-QAPP (PQAPP) <br />(AECOM, 2018). The PQAPP is comprehensive and is consistent with the USEPAs intent that <br />the UFP-QAPP be the primary planning document for an entire project (Intergovernmental Data <br />Quality Task Force [IDQTF], 2005a -c). This QAPP Addendum, in combination with the PQAPP <br />elements, meets the requirements set forth in the UFP for QAPPs (IDQTF, 2005a -c) and USEPA <br />Requirements for Quality Assurance Project Plans (USEPA, 2001). <br />This QAPP Addendum was prepared to include the detailed information specific to the SI at <br />Stockton AASF. For ease of review, material from the PQAPP is included in this deliverable <br />alongside the Stockton AASF-specific worksheets. Table 1-1 below describes the components <br />that are covered under the PQAPP and those that are covered under this UFP-QAPP Addendum. <br />Table 1-1: Comparison of PQAPP to QAPP Addendum <br />AECOM 1-2 <br />Worksheets #1 and #2- Title and Approval Page <br />Programmatic/Site-Specific <br />and QAPP Identifying Information <br />Worksheets #3 and #5- Project Organization and7 <br />Programmatic/Site-Specific <br />QAPP Distribution <br />Worksheets #4, #7, #8- Personnel Qualifications <br />Programmatic/Site-Specific <br />and Sign -off Sheet <br />Worksheet #6- Communication Pathways <br />Programmatic/Site-Specific <br />Worksheet #9- Technical Project Planning <br />Site -Specific <br />Session Summary <br />Worksheet #10- Conceptual Site Model <br />Site -Specific <br />Worksheet #11- Project/ Data Quality Objectives <br />Site -Specific <br />Worksheet #12- Measurement Performance <br />Programmatic <br />Criteria <br />Worksheet #13- Secondary Data Uses and <br />Programmatic <br />Limitations <br />Worksheets #14 and #16- Project Tasks and <br />Site -Specific <br />Schedule <br />Worksheet #15- Screening Limits and <br />Laboratory- Specific Detection/ Quantitation <br />Programmatic <br />Limits <br />Worksheet #17- Sampling Design and Rationale <br />Site -Specific <br />Worksheet #18- Sampling Locations and <br />Site -Specific <br />Methods <br />Worksheets #19 and #30- Sample Containers, <br />Programmatic <br />Preservation and Hold Times <br />AECOM 1-2 <br />